Download presentation
Presentation is loading. Please wait.
1
IEKP - Universität Karlsruhe (TH)
Status IQC Karlsruhe IEKP - Universität Karlsruhe (TH) 5/18/2019 Sensor Meeting - TW Sept. 02
2
W2 & W4 - Wien Sets Fluence: (2.25±0.1)e14 n/cm² [14a LHC]
(2), (2), (1), (1) 5/18/2019 Sensor Meeting - TW Sept. 02
3
Sensor Meeting - TW Sept. 02
CV W4 W3 5/18/2019 Sensor Meeting - TW Sept. 02
4
Sensor Meeting - TW Sept. 02
IV 5/18/2019 Sensor Meeting - TW Sept. 02
5
Sensor Meeting - TW Sept. 02
Cint No probe correction ! Flat Cint ramp! 5/18/2019 Sensor Meeting - TW Sept. 02
6
Sensor Meeting - TW Sept. 02
Rpoly & Ileak -3°C 5/18/2019 Sensor Meeting - TW Sept. 02
7
Sensor Meeting - TW Sept. 02
Cc, Idiel & Rint 5/18/2019 Sensor Meeting - TW Sept. 02
8
W3 -KA Set H1 Fluence: (2.25±0.1)e14 n/cm² [14a LHC]
, , 5/18/2019 Sensor Meeting - TW Sept. 02
9
Sensor Meeting - TW Sept. 02
CV 5/18/2019 Sensor Meeting - TW Sept. 02
10
Sensor Meeting - TW Sept. 02
IV 5/18/2019 Sensor Meeting - TW Sept. 02
11
Sensor Meeting - TW Sept. 02
Cint No probe correction ! Flat Cint ramp! 5/18/2019 Sensor Meeting - TW Sept. 02
12
Sensor Meeting - TW Sept. 02
Rpoly & Ileak 5/18/2019 Sensor Meeting - TW Sept. 02
13
Sensor Meeting - TW Sept. 02
Cc, Idiel & Rint 5/18/2019 Sensor Meeting - TW Sept. 02
14
Sensor Meeting - TW Sept. 02
Summary W2, W3 and W4 teststructures are qualified ! No change of Cint and Cc No developement of pinholes Rint above 400V Rpoly seems to be increased Measurement and Ileak correction to be further investigated 5/18/2019 Sensor Meeting - TW Sept. 02
15
OB2 - Pisa Sets Fluence: (0.7±0.1)e14 n/cm² [ 20a LHC]
(12), (8), (25), (16), (15), (18), (24), (17), (19), (26), (23) 5/18/2019 Sensor Meeting - TW Sept. 02
16
Sensor Meeting - TW Sept. 02
CV HH-model: Udep~310V 5/18/2019 Sensor Meeting - TW Sept. 02
17
Sensor Meeting - TW Sept. 02
IV 5/18/2019 Sensor Meeting - TW Sept. 02
18
Sensor Meeting - TW Sept. 02
Cint 5/18/2019 Sensor Meeting - TW Sept. 02
19
Sensor Meeting - TW Sept. 02
Rpoly & Ileak 5/18/2019 Sensor Meeting - TW Sept. 02
20
Sensor Meeting - TW Sept. 02
Cc, Idiel & Rint 5/18/2019 Sensor Meeting - TW Sept. 02
21
Sensor Meeting - TW Sept. 02
Summary Problems with Cint for Pisa set 15 and 16 ! Might be due to high fluence (20 years LHC), but other sensors behave different ! Cint ramps totally different to HPK sensors ! No saturation at small voltages ! 5/18/2019 Sensor Meeting - TW Sept. 02
22
Sensor Meeting - TW Sept. 02
Outlook IB1 and IB2 already qualified last TW Irradiated sensors: ST-OB HPK-W Still some irrad. structures to be qualified Prequalification for PG4-6 and Pisa done ! Module ready for irradiation Cyclotron closed for maintenance for 4 weeks ! 5/18/2019 Sensor Meeting - TW Sept. 02
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.