Presentation is loading. Please wait.

Presentation is loading. Please wait.

SPS Planning meeting for LS2 #16 Vacuum sectors situation

Similar presentations


Presentation on theme: "SPS Planning meeting for LS2 #16 Vacuum sectors situation"— Presentation transcript:

1 SPS Planning meeting for LS2 #16 Vacuum sectors situation
Antonio Grande EN-ACE 23-Jan-2019

2 Vacuum sectors situation at 23/01/2019
Sectors Opened 22/68 * Point 1 Arc 1- (2/2) 111 112 LSS 1 (6/11) 120 134 – current* 135 – current 136 – current 141 – current 142 – current 143 150 Arc 1+ (2/2) 161 162 TT10 Point 2 Arc 2- (1/1) 210-current LSS 2 (5/6) 220 231 233 240* 251 Arc 2+ (2/2) 261 262 TT20 Point 3 Arc 3- (2/2) 311 312 LSS 3 (9/9) 321 331 332 333 334 335 336 337 351 Arc 3+ (2/2) 361 362 Point 4 Arc 4- (2/2) 411 412 LSS 4 (5/6) 420 421 425 430 435 Arc 4+ (1/2) 461 462 TI8 Point 5 Arc 5- (2/2) 511 512 LSS 5 (5/5) 520 – current 521 – current 522 – current 530 – current 550 – current Arc 5+ (2/2) 561 562 Point 6 Arc 6- (2/2) 611 612 LSS 6 (6/8) 621 631 632 634 635 640* 651 Arc 6+ (2/2) 661 662 TT60 Point 7 TI2 TT66 In time Delayed In advance Extra* 19/19 2 1 19 sectors opened in line with planning 1 extra sector opened for TT10 access  66 to 67 sectors to be opened in total 2 sectors opened before granting TT20 – TT60 access No openings forecasted in next 2 weeks (magnet campaign can affect one sector opening: s.462)67 to 68 Sectors to be opened during LS2: 66 to 68 23-Jan-2019 SPS Vacuum sectors situation- Antonio Grande EN-ACE

3 SPS Vacuum sectors situation- Antonio Grande EN-ACE
LSS1 Current and next two weeks situation Current situation Next two weeks situation 23-Jan-2019 SPS Vacuum sectors situation- Antonio Grande EN-ACE

4 SPS Vacuum sectors situation- Antonio Grande EN-ACE
LSS2 Current and next two weeks situation Current situation Next two weeks situation 23-Jan-2019 SPS Vacuum sectors situation- Antonio Grande EN-ACE

5 SPS Vacuum sectors situation- Antonio Grande EN-ACE
LSS3 Current and next two weeks situation Current situation Next two weeks situation 23-Jan-2019 SPS Vacuum sectors situation- Antonio Grande EN-ACE

6 SPS Vacuum sectors situation- Antonio Grande EN-ACE
LSS4 Current and next two weeks situation Current situation Next two weeks situation 23-Jan-2019 SPS Vacuum sectors situation- Antonio Grande EN-ACE

7 SPS Vacuum sectors situation- Antonio Grande EN-ACE
LSS5 Current and next two weeks situation Current situation Next two weeks situation 23-Jan-2019 SPS Vacuum sectors situation- Antonio Grande EN-ACE

8 SPS Vacuum sectors situation- Antonio Grande EN-ACE
LSS6 Current and next two weeks situation Current situation Next two weeks situation 23-Jan-2019 SPS Vacuum sectors situation- Antonio Grande EN-ACE

9 All comments are more than welcome but please let me know by mail
Thank you


Download ppt "SPS Planning meeting for LS2 #16 Vacuum sectors situation"

Similar presentations


Ads by Google