Download presentation
Presentation is loading. Please wait.
Published byอักขระ ติณสูลานนท์ Modified over 5 years ago
1
WWater reuse SCG Water Reuse 1/10/2014 Dagmar BEHRENDT KALJARIKOVA
Water Unit Directorate General for Environment European Commission 1
2
State of play – Water reuse
BIO Intelligence contract – Review previous work, finalise methodology (scope, problem definition, baseline scenario); identify policy options; impact assessment Scope of the study: Reuse of urban wastewater that is treated after collection and has been subject to secondary treatment (at least) Reuse of industrial wastewater for external purposes For various types of applications, e.g.: agricultural uses, urban uses, industrial uses, environmental uses, recreational uses Not covered by this study: reuse of rainwater or greywater 2 2 2 2
3
Potential EU-level measures
No action: no policy change Non-binding measures aimed at improving: the implementation/enforcement of pricing, controls of abstractions and integrated water management, promotion of upcoming ISO/CEN water reuse standards, promotion of risk-based approaches for regulating water reuse. Binding standards on water reuse and/or binding framework for water reuse practices on the basis of a risk-based approach in order to maximise water reuse, where necessary, and to provide a clear framework for managing health and environmental risks related to water reuse practices. This could encompass elements such as risk management plans, treatment standards, treatment process controls, application controls and water quality benchmarks, possible requirement to consider and/or establish targets on water reuse in the context of integrated water management where relevant, etc. Information, communication and knowledge enhancement measures including EU guidance development, knowledge sharing and awareness raising actions targeting the general public and the practitioners. To reinforce the achievement of the main objectives, the above options could be combined, e.g. information, communication and knowledge enhancements measures could accompany the non-binding or binding measures. 3 3 3 3
4
Impact assessment of the identified policy options
Next steps Impact assessment of the identified policy options Impact Assessment Roadmap – publication after agreed with other DGs/services and SG Public consultations launched (questionnaire + background document) – 30 July 2014 – 7 November 2014( Stakeholders meeting – November/December 2014 Completion of IA (proposal of an EU level instrument on water reuse) – December 2014 EC Impact Assessment Board – Spring 2015 Commission proposal of an EU-level instrument on water reuse (if justified) – end 2015 4 4 4 4
7
Thank you for your attention. http://ec. europa
Blueprint Communication COM(2012)673+ Impact Assessment SWD(2012) 381 & 382 Update on water reuse and links to CIRCABC Report on River Basin Management Plans COM(2012)670 Commission Staff Working Document, European Overview on River Basin Management Plans, Volumes 1 and 2 SWD(2012) 379 Commission Staff Working Document, River Basin Management Plans, Volumes 3 to 30 (All Member States + Norway) SWD(2012) 379 Communication on the Review of the European Water Scarcity and Drought Policy COM(2012)672 + accompanying Commission Staff Working Document SWD(2012)380 Fitness Check SWD (2012)393 7 7 7
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.