Download presentation
Presentation is loading. Please wait.
Published byMirella Miranda Modified over 5 years ago
1
-BY H R PATEL DE HILLDRIVE SDN BHAVNAGAR CITY 2 DIVISION
DIGITAL METERS -BY H R PATEL DE HILLDRIVE SDN BHAVNAGAR CITY 2 DIVISION
2
DIGITAL METERS SINGLE PHASE THREE PHASE(WHOLE CURRENT)
THREE PHASE CT OPERATED SOLAR BIDIRECTIONAL METER(1PH AND 3PH ) THREE PHASE HT METER(TVM)
3
SINGLE PHASE MEETR WORKS ON SINGLE PHASE SUPPLY FOURE TERMINALS
MAX CAPACITY (30AMP) P P N N
4
THREE PHASE METER (WHOLE CURRENT)
WORKS ON THREE PHASE 4WIRE SYSTEM 8-TERMINALS RM-RL-YM-YL-BM-BL-NM-NL AMP CAPACITY 10-60AMP
5
TB CONNECTION IN WC METERS
6
THREE PHASE CT OPERATED
WORKING ON THREE PHASE 3WIRE 10 TERMINALS (1S1-R-1S2-2S1-Y-2S2-3S1-B-3S2-N) AMP CAPACITY AMP CT RING EXTERNALLY CONNECTED PT SUPPLY 240V EACH PHASE(DIRECT FROM SUPPLY CABLE) HAVING MF =CT CTR*CT PTR/METER CTR*METER PTR 1S1-R-1S2-2S1-Y-2S2-3S1-B-3S2-N
7
TB CONNECTION IN CT OPERATED METER
8
THREE PHASE HT METER CTPT OPERATED METER 3PHASE 4WIRE METER
CT AND PT BOTH EXTERNALLY SUPPLIED TO METER CAP -1/-5A,-/110V(PRIMERY VOLTAGE 11KV) CONNECTION PROVIDE THROUGH TTB(TEST TERMINAL BLOCK) MF =(CT CTR*CT PTR)/(METER CTR*METER PTR)
9
TTB CONNECTION WITH HT TVM
10
MF CALCULATION EXAMPLE
For 22kv supply, the CTPT unit would naturally be of 22kv/110v and hence, calculation of MF for CTPT unit of 30/5A, the MF would be as under: MF= Such installations are there under Surendranagar circle.
11
IMPORTANT METER PARAMETERS
VOLTAGE CURRENT KWH KVARH (LAG) KVARH(LEAD) RMD(KW) BMD(KW) DATE AND TIME POWER FACTOR In bidirectional meter IMPORT kwh and EXPORT kwh both reading taken
12
POWER FACTOR IMPORTANT OF POWER FACTOR POWER FACTOR
INCREASE EFFICIENCY OF SYSTEM MAXIMIZE CAPACITY IMPROVE VOLATAGE REDUCE LOSS SYSTEM STABILITY(FREQ MAINTAIN) DEMAND MANAGEMENT POWER FACTOR PF(AVG)= ACTIVE ENERGY(KWH) APPERANT ENERGY(KVAH) IT SHOULD BE NEAR TO 1(ONE)
13
HOW POWER FACTOR EFFECTS
KVAR (LAG)(Q) KVAR(LEAD) KW KVA(S) KW(P)
14
POWER FACTOR IMPROVEMENT
SIMPLY USING CAPACITOR BANK CALCULATION OF CAPACITOR REQIURED Q= S² - P² KVA=KW/cosΦ Xc (CAPACITANCE)=1/2∏fc Q=VI sinΦ VAR Q= V²/Xc VAR C= Q/ 2∏f V² farad
15
CT OPERATED METER CHEKING
METER DETAIL(INCLUDING METER CT RATIO AND PT RATIO) CT RING DETAIL(RATIO) PT RATIO FINDING MF = CT CTR*CT PTR METER CTR*METER PTR DETAIL OF CTPT UNIT IF IT IS EXTERNAL
16
TTB(TEST TERMINAL BLOCK)
As its name, it is used for the testing of meter without opening meter TC(w/o disturbance of metering) It used in HT/EHT METERS Easily series the Accu-chek meter with Consumer meter CT worked in normal mode From TTB PT can be opened
17
TTB
18
MRI REPORT DETAIL of MRI Instantaneous Parameters
Energy value(generally as per last 12 history/reset ) Load survey data Tampered data Transactions
19
CTPT TERMINAL BOX PT CONT R-Y-B CT CONT 1S-2S n-N CONT
20
1PH DIGITAL METER CONSTRUCTION
21
3PH DIGITAL METER CONSTRUCTION
23
MAIN PARTS OF DIGITAL METERS
TRANSDUCER(sencers) ASIC(Application Specified Integrated Circuit) ADCs(Analog to Digital Converter) LCD DISPLAY WDT(TIMER) RTC LED INFRARED COMUNICATION (LED) UART(UNIVERSAL ASYNCRONOUS RECIVER/TRASMITTER)+PREPAID CARD MODULE(IN PREPAID METERS) PUSH BUTTEN SWITCH
24
SOLAR METER CONNECTION
CONTROLER/INVERTER UNIT GENERATION METER MAIN METER SOLAR PANEL FROM THE SERVICE POLE MAIN SWITCH CONSUMER LOAD SIDE
25
Thank you!!!!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.