Presentation is loading. Please wait.

Presentation is loading. Please wait.

ANNUAL PLAN 2019/20 Council Workshop 21 November 2018.

Similar presentations


Presentation on theme: "ANNUAL PLAN 2019/20 Council Workshop 21 November 2018."— Presentation transcript:

1 ANNUAL PLAN 2019/20 Council Workshop 21 November 2018

2 Purpose of today Recap of LTP for 2019/20 The changes Rates impact
Consultation approach Next steps

3 A recap - the Long Term Plan 2018-28

4 We set GW’s direction for the 10 years
An extraordinary region – thriving, connected and resilient 4 Strategic Priorities Fresh water quality and biodiversity Regional resilience Water supply Public transport Leadership areas Business as usual

5 We planned for the future

6 We noted the key drivers impacting the business – 3 year

7 We agreed our activities

8 We set the LTP rates

9 Assumptions in the LTP for 19/20
Patronage Growth Bus – 1.00% Rail – 2.50% Fare increases based on the BERL CPI adjustor Bus and Rail – 1.60% Insurance – at the rate of inflation Personnel market movement – 2% Note: in 2018/19 we had a 3% fare increase and a reduction in total fares of $7.5m to pay for new fare initiatives

10 Things have changed…

11 Changes to the key drivers of the LTP – 3 year

12 Our base assumptions since the LTP
Unchanged: Inflation Personnel market movement Insurance (identified as a risk) Fare increases Changed: Bus contract indexation

13 Non PT changes +ve = Increases rates -ve = Decreases rates Activity
Rates Impact 19/20 $M Natural Resources Plan Ongoing hearing and implementation costs + 0.5 Wellington Accommodation New premises – fit-out and lease costs + 0.3 Let’s Get Wellington Moving Revised costings for planning stage + 0.1 Total + 0.9 +ve = Increases rates -ve = Decreases rates

14 PT changes +ve = Increases rates -ve = Decreases rates Activity Change
Rates Impact 19/20 $M Bus network changes / enhancements (next slide) + 3.7 + 1.8 Increased fare revenue - 0.9 - 0.4 FY18/19 capex changes + 3.4 + 0.2 Indexation changes (Fuel costs etc) + 1.2 + 0.6 Other bus contract changes - 1.0 - 0.5 Other cumulative changes + 1.9 + 0.9 Total + $2.6 +ve = Increases rates -ve = Decreases rates

15 Bus network changes Change $M
NZ Bus Enhancement packages and reschedules 1.4 Tranzurban Enhancement packages and reschedules 0.8 Route 18E extension 0.5 Route 14 extension (including 1 peak vehicle) 0.3 Provision for peak requirements 0.7 Total 3.7

16 Other PT changes - $1.9M Favourable movements Rail operator costs
KiwiRail Network Agreement Bus advertising revenue Unfavourable movements IT Systems Support Double decker road maintenance and tree clearance Snapper fee Rail traction electricity Total Mobility Subsidies

17 What’s not included Bus network changes Additional electric buses
Route 10 and 23 services to access the Zoo and Newtown Flats Splitting of Route 2 at Miramar Additional services for Vogeltown and Mornington Additional electric buses

18 There remain some risks and uncertainties
Risk / Uncertainty NZTA funding for the bus enhancements Riverlink – rental revenue LGWM - costs for planning phase likely to be higher than allowed for Fares revenue - patronage & inflation WREMO - building rental costs Long Distance Trains – options and funding Ferry Terminal – business case and follow-up work Impacts of decisions beyond 2019/20 Fare increase – Council decides not to increase fares in line with inflation

19 Full impact on rates

20 Options available External revenue assumptions (eg. Patronage)
Additional PT fare increases Timing and extent of GW activities Assumptions on cost drivers Repayment term of loans Use of reserves (timing only) Timing of capital programmes of work

21 PT reserve movements

22 LTP rate profile

23 Applying possible funding options

24 Water levy 3.5% - no change from the LTP
Changes in the timing of projects being discussed 2018/19 2019/20 $33.1m $34.2m

25 Consultation and engagement

26 Our options Our approach will depend on the budget and what changes are included or not Two basic options: We inform and engage – tell the story of why there are changes and do not consult on options We consult – we have clear options to consult with the public on

27 Proposed approach The key drivers of budget change in 2019/20 are:
decisions that Council have already made (i.e. bus services) Increased costs for existing programmes (i.e. LGWM, NRP) Changes to assumptions As such there are no real options to genuinely consult the public on Recommendation – inform and engage

28 Consultation and engagement?
Next steps Workshop 13 December Draft Annual Plan Draft Budget Consultation and engagement approach Workshop 7 Feb Annual Plan Consultation/ engagement document Consultation approach Meeting 26 Feb Confirm draft Annual Plan Adopt consultation/ engagement document Engagement March Consultation and engagement?

29 End of presentation


Download ppt "ANNUAL PLAN 2019/20 Council Workshop 21 November 2018."

Similar presentations


Ads by Google