EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019
2
Main activities of the comming weeks
LIU-SPS RF – BA3: - Removal of equipment's LIU-SBDS – BB5: - Removal ongoing of equipment in the LSS5 (~80% done) - Delivery of scaffolding, cable drums, skip for de cabling campaign etc Ac Coating Fire safety: - Delivery of pipes for the fire hydrant on the arc’s ongoing
3
Transport and handling issues over the last 2 weeks
Packing to be done before transport to the buffer zone -> The equipment's owners should take care of packing (especially for the small items)
4
Transport and handling issues over the last 2 weeks
Some issues with the EDH request form (request not received by transport group)
5
Transport and handling issues over the last 2 weeks
Please add: Pascal Brunero et Sylvain Fumey in copy of all your EDH transport and handling from and to the SPS (surface and underground)
6
10t Crane in ECX4 Out of service for about 2 weeks (brake need to be changed)
7
Contacts Handling operations supervision Crane maintenance
Pascal Brunero , Sylvain Fumey Crane maintenance Bruno Feral (Roberto Rinaldesi ) Lift maintenance Gilles Roche (Jérome Brun ) In case of failure of transport and handling equipment (crane, electric tractor) 72201
8
Impacts For handling operations -> please add us as supervisors
e-groups: - en-dep-he-hh - S172-Transport-ALTEAD