Download presentation
Presentation is loading. Please wait.
Published byBenny Armiger Modified over 10 years ago
1
SP-99280 1 TSG-T Progress Report TSG-SA Working Group 1 (Services) meeting #4TSG S1#4 (99)440 Quebec City, Quebec, Canada 5 th -9 th, July 1999 Agenda Item:4.2.0 TSG-T Progress Report TSG-T Chairman: Sang-Keun Park (Samsung Electronics, TTA)
2
SP-99280 2 Progress ReportProgress Report –T1: Conformance Testing –T2: Services and Capabilities –T3: USIM List of Approved DocumentList of Approved Document List of Documents for InformationList of Documents for Information Requesting to SARequesting to SA Meeting CalendarMeeting Calendar Contents
3
SP-99280 3 T1 Conformance Testing SWG SignalingSWG Signaling –Types of test case: Regulatory/Interoperability/VoluntaryRegulatory/Interoperability/Voluntary –Development of 3GPP TTCN Test Spec. -Funding for STF to develop the protocol conformance tests in TTCN for the MS interoperability (SP-99278) -NOTE: Some manufacturers will produce 3GPP test equipment. The interface between the test specifications and the TTCN test equipment should be standardised
4
SP-99280 4 SWG EMCSWG EMC –New Chairman : John Fenn (SAMSUNG/ETSI) –Two stages on the specifications: -Stage1: Report/Specification on regional EMC requirements -Stage2: Intend to produce global EMC requirements -SWG RF –Logical Test Interface FDD and TDD to be merged in July 1999 as TS 34.109 FDD and TDD to be merged in July 1999 as TS 34.109 Delayed to be v1.0.0: inconclusive BER/FER issues (RAN4) Delayed to be v1.0.0: inconclusive BER/FER issues (RAN4) T1 Conformance Testing
5
SP-99280 5 SWG RF (Continued)SWG RF (Continued) –TS 34.121: Measurement Procedure (FDD) changed Title to Terminal Conformance Specification, Radio Transmission and Reception (FDD) changed Title to Terminal Conformance Specification, Radio Transmission and Reception (FDD) updated from v0.2.0 to v1.0.0. updated from v0.2.0 to v1.0.0. –TS 34.122: Measurement Procedure (TDD) changed Title to Terminal Conformance Specification, Radio Transmission and Reception (TDD) changed Title to Terminal Conformance Specification, Radio Transmission and Reception (TDD) cannot be updated to v1.0.0 due to due to lack of contributions cannot be updated to v1.0.0 due to due to lack of contributions Related RAN4 document must be stabilised by OctoberRelated RAN4 document must be stabilised by October –In order to finalise the RF specifications by end of 1999
6
SP-99280 6 T2 Services & Capability SWG1 (MExE)SWG1 (MExE) –MExE R98 GSM 03.57 Finalised and will be presented to SMG#29 for approvalFinalised and will be presented to SMG#29 for approval Presented as 3G TS 23.057 v1.1.0 to TSG-T Presented as 3G TS 23.057 v1.1.0 to TSG-T For information because it is the basis of the new MExE release For information because it is the basis of the new MExE release –Work on New release Start as soon as Stage 1 for MExE R99 is approved at SMG#29Start as soon as Stage 1 for MExE R99 is approved at SMG#29
7
SP-99280 7 T2 Services & Capability SWG2 (Terminal Interfaces)SWG2 (Terminal Interfaces) –Some progress on the discussion on whether the physical connector of the terminal should be standardised or not TSG-T sent a LS to OP and PCG asking for clarification of the term Global circulation –Next TSG-T2 SWG2 Report on Synchronisation and Object exchangeReport on Synchronisation and Object exchange No input: Alternatives to AT commandsNo input: Alternatives to AT commands There might be some input on the coding of additional language characters in SMS text strings and phonebook (Japanese, Korean, Chinese etc.)There might be some input on the coding of additional language characters in SMS text strings and phonebook (Japanese, Korean, Chinese etc.)
8
SP-99280 8 T2 Services & Capability SWG3(Messaging)SWG3(Messaging) –Decision of S1 Stage 1 for the Multimedia Messaging Service (MMS) should be produced by T2Stage 1 for the Multimedia Messaging Service (MMS) should be produced by T2 –First draft discussed –An enhanced cell broadcast service No progress due to no inputNo progress due to no input SWG5 (Multi-mode Terminals)SWG5 (Multi-mode Terminals) –Working on the report Multi-mode terminal issues : to be completed by Oct. 1999
9
SP-99280 9 T2 Services & Capability SWG6 (Terminal Features & Performance)SWG6 (Terminal Features & Performance) –New Chairman: Kazuya Hashimoto (NEC/ETSI) –Terminal Capabilties issue TR 21.904 v.0.0.3 Terminal Capabilities Requirements is being drafted.TR 21.904 v.0.0.3 Terminal Capabilities Requirements is being drafted. T1 is discussing how the work on terminal capabilities in T2 should be used.(e.g. for ICS)T1 is discussing how the work on terminal capabilities in T2 should be used.(e.g. for ICS) New LSs to other WGs will be sent.New LSs to other WGs will be sent. One coordinator/Each WG has been assigned to monitor the progress on baseline & service capabilities issuesOne coordinator/Each WG has been assigned to monitor the progress on baseline & service capabilities issues
10
SP-99280 10 T3 USIM Status of DeliverablesStatus of Deliverables TS 21.111 (v.3.0.0) USIM and IC Card Requirements- no changes. TS 21.111 (v.3.0.0) USIM and IC Card Requirements- no changes. Progress reported on both deliverablesProgress reported on both deliverables TS 31.101 v 0.5.0TS 31.101 v 0.5.0 –UICC physical & logical characteristics TS 31.102 v 0.5.0TS 31.102 v 0.5.0 –USIM characteristics Planned to submit for information (v.1.0.0) to TSG- T#5 in October 1999Planned to submit for information (v.1.0.0) to TSG- T#5 in October 1999
11
SP-99280 11 T3 USIM Phonebook issuePhonebook issue More complex than GSM ADN More complex than GSM ADN Examples Examples Second names, Fax numbers imply linked records, etc. Second names, Fax numbers imply linked records, etc. Progress Progress Three different proposals under evaluation Three different proposals under evaluation Decision at the coming T3 meeting Decision at the coming T3 meeting @ Lund, July 1999 @ Lund, July 1999
12
SP-99280 12 USIM T3 USIM Allocation of Application Identifiers (AIDs)Allocation of Application Identifiers (AIDs) –USIM application(s) require IDs on the UICC –Three scenarios for their management (TP-99131) one of the 3GPP OPs applies for a RID (Registered Application Provider Identifier) and administers the list of AIDs for 3GPP (possibly ETSI which already has a RID)one of the 3GPP OPs applies for a RID (Registered Application Provider Identifier) and administers the list of AIDs for 3GPP (possibly ETSI which already has a RID) 3GPP as an organisation in its own right applies for a RID, and 3GPP or one of the partners maintains the list of AIDs for 3GPP3GPP as an organisation in its own right applies for a RID, and 3GPP or one of the partners maintains the list of AIDs for 3GPP each partner independently applies for a RID and T3 specifies the structure of the PIX (Proprietary application identifier extension) in a 3GPP document, which applies to all Partnerseach partner independently applies for a RID and T3 specifies the structure of the PIX (Proprietary application identifier extension) in a 3GPP document, which applies to all Partners –TSG-T suggested the second option as the most suitable and asks TSG-SA/PCG for endorsement
13
SP-99280 13 T3 USIM Transfer of GSM specifications to 3GPPTransfer of GSM specifications to 3GPP GSM 11.14 SIM Application Toolkit GSM 11.14 SIM Application Toolkit Major importance for development of operator specific services Major importance for development of operator specific services Two major problems were identified:Two major problems were identified: -Use of toolkit applications on UICCs with more than one USIM Resource problem on restructuring of documentResource problem on restructuring of document
14
SP-99280 14 T3 USIM GSM 11.17 SIM Conformance Test Specification - optional GSM Phase 2+ specification GSM 11.17 SIM Conformance Test Specification - optional GSM Phase 2+ specification Needs to be rewritten due to (some) different requirements - considered of secondary importance w.r.t. testing Needs to be rewritten due to (some) different requirements - considered of secondary importance w.r.t. testing Urgent requirement Urgent requirement transforming section 27 of GSM 11.10 into a test specification for the UICC-Terminal interface transforming section 27 of GSM 11.10 into a test specification for the UICC-Terminal interface T3 has currently no resources to do either taskT3 has currently no resources to do either task Request for funding of USIM testing (SP-99277)Request for funding of USIM testing (SP-99277)
15
SP-99280 15 Approved Documents(1) –TS 27.005: Use of Data Terminal Equipment-Data Circuit terminating; Equipment (DTE-DCE) interface for Short Message Service (SMS) and Cell Broadcast Service (CBS) –TS 27.007: AT command set for 3GPP User Equipment (UE) –TS 27.010: Terminal Equipment to Mobile Station (TE-MS) multiplexer protocol –TS 23.038: Alphabets and language-specific information
16
SP-99280 16 Approved Documents(2) –TS 23.039: Interface protocols for the connection of Short Message Service Centres (SMSCs) to Short Message Entities (SMEs) –TS 23.040: Technical realisation of the Short Message Service (SMS); Point-to-Point (PP) –TS 23.042: Compression algorithm for text messaging services –TR 34.925: Specific Absorption Rate (SAR) requirements and regulations
17
SP-99280 17 –TR 34.907: Electrical safety requirements and regulations –TR 34.925: Terminal Capability requirements (v.1.0.0) is plan to TSG-T#5 in October 1999 Documents for Information
18
SP-99280 18 Requesting to SA Request for funding of USIM testing Request for funding of USIM testing 6/8 months (see SP-99277). 6/8 months (see SP-99277). Request for funding of protocol conformance tests in TTCN for the MS interoperability Request for funding of protocol conformance tests in TTCN for the MS interoperability 6.5 years (see SP-99278) 6.5 years (see SP-99278) Request for guidance on Harmonised Regulatory Standards for 3GPP Terminals Request for guidance on Harmonised Regulatory Standards for 3GPP Terminals See SP-99279 See SP-99279 Request for endorsement of approach on Allocation of Application Identifiers (AIDs) Request for endorsement of approach on Allocation of Application Identifiers (AIDs) Request for harmonisation in Terminology Request for harmonisation in Terminology
19
SP-99280 19 Meeting Calendar Meeting No. DateLocationHost Year 1999 TSG-T#5 7-8 OctKoreaTTA TSG-T#6 13-15 Dec. FranceETSI Year 2000 TSG-T#7 13-15 Mar. SpainTelefonica TSG-T#8 5-7 June GermanyMannesmann TSG-T#9 25-27 Sep. Host required! TSG-T#10 11-13 Dec.Host required!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.