Download presentation
Presentation is loading. Please wait.
1
REX posts AB minimum request:
2 engineer/physicist posts + 2 technician posts 120 kchf/year exploitation budget 50 kchf/year consolidation budget Cost for posts per year: (51% maximum overhead) Enginner post: CHF Technician post (higher): CHF Technicina post (lower): CHF Present funding: : IKS KU Leuven: CHF/year 2003: BMBF: 2*35520 KCHF : BMBF: 2* CHF/year 2006: BMBF: 2* CHF Situation May 2003 for 2003 Cost for four month: CHF Budget: CHF Cost for 12 month: CHF Budget: CHF 2005 Cost for 8 month: CHF Budget: CHF Mats Lindroos
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.