Smart Grid Closing Report – November 2010
doc.: IEEE /1385r0 November 2010 Smart Grid Closing Report – November 2010 Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA, 95054 Jorjeta Jetcheva Itron Date: 2010-November-10 Abstract: NIST PAP#2 Report r6 recommended changes Other Smart Grid activities Bruce Kraemer, Marvell Bruce Kraemer (Marvell)
2
Agenda Topics for the Week
November 2010 Agenda Topics for the Week Action Item Finalize change suggestions for the NIST PAP#2 Report Information Items SGIP update ITU Focus Group UK Consultation March 2011 Tutorial topics/speakers Bruce Kraemer, Marvell
3
re-confirmed Nov 4 NIST Timeline November 2010 Draft 0.5 July 28, 2010
doc.: IEEE /1385r0 November 2010 NIST Timeline re-confirmed Nov 4 Draft 0.5 July 28, 2010 Call for Input to Section 6 August 4, 2010 End of draft 0.5 review period September 15, 2010 SGIP face-to-face, St Louis Tentative PAP 2 meeting September 16, 2010 September 30, 2010 Release of draft 0.6 October 29, 2010 End of draft 0.6 review period November 4, 2010 OpenSG meeting, Miami Tentative PAP 2 meeting December 3, 2010 SGIP face-to-face, Chicago PAP 2 meeting Release of Version 1 Bruce Kraemer, Marvell Bruce Kraemer (Marvell)
4
We discovered we needed to create a mesh definition because we
November 2010 doc.: IEEE /1385r0 November 2010 IEEE 802 contributed a number of suggestions on how to change the NIST PAP#2 Report r6. These were contained in documents 1210 and We discovered we needed to create a mesh definition because we could not find one. Bruce Kraemer, Marvell Bruce Kraemer (Marvell)
5
Conclusion Material will be cleaned up and submitted to NIST asap.
November 2010 Conclusion Material will be cleaned up and submitted to NIST asap. Bruce Kraemer, Marvell