Download presentation
Presentation is loading. Please wait.
1
Comments Ref:WLTP-2013-029 (17/09/13)
WLTP-DTP-LabProcICE-259 Comments Ref:WLTP (17/09/13) Not the same terms for the def for optional equipment
2
Annex4 As the calculation method is not in annex 4, may be useful to give the reference where the calculation can be found of annex 7
3
Annex 4 As w1 comes from aero shouldn’t it be corrected with K2? In Utac 3%, 5% and 10% are currently used, including interlaboratory testing => gives good repeatability on the results
4
Annex 4 This paragraph is unclear
Might be useful to add “vehicle H” and “vehicle L” in the definitions list
5
Annex 5 Could HFID be also integrated for methane? 5.1
6
Annex 5 To be consistent with H13 should be 99.95
7
Annex 6 I do not understand the comment on this point as the time is defined to be 0.5s => max 5s on cycle
8
Annex 6
9
Annex 7 Purpose of rounding up intermediate calculation values?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.