Presentation is loading. Please wait.

Presentation is loading. Please wait.

平成31年5月 doc.: IEEE 802.11-00/424r1 Jan 2009 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Closing.

Similar presentations


Presentation on theme: "平成31年5月 doc.: IEEE 802.11-00/424r1 Jan 2009 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Closing."— Presentation transcript:

1 平成31年5月 doc.: IEEE /424r1 Jan 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Closing Report Jan 2009 Los Angeles] Date Submitted: [22 Jan 2009] Source: [Reed Fisher] Company [Oki Electric Industry Co., Ltd.] Address [2514 E. Maddox Rd., Buford, GA USA.] Voice:[ ] Re : [] Abstract:[Description of TG3c Jan 2009 meeting reports ] Purpose:[Report to Closing Interim Meeting, Jan 2009] Notice :This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Reed Fisher, OKI Stuart J. Kerry - Philips Semiconductors, Inc.

2 Los Angeles, CA, USA Closing Report Jan, 2009
TG3c 23rd Meeting Los Angeles, CA, USA Closing Report Jan, 2009 Reed Fisher, OKI

3 1. 10.30am Monday, Jan 19. Call to order.
2. TG3c Leadership: Chair: R. Fisher. Vice Chair: A Mathew, S. Kato Secretaries : T. Baykas, C.S. Sum Technical Editor: J. Gilb Sub Editors: C. Ngo, T. Baykas, C.S. Sum, B. Gaffney, Z.Lan 3. Fourteen 2-hour time slots were allocated, 6 carried out Jan 19 (Mon) Jan 20 (Tue) Jan 21 (Wed) Jan 22 (Thu) AM1 X (canceled) X AM2 PM1 PM2 R. Fisher, Oki Electric Industry co. Ltd

4 Meeting Accomplishments (1/2)
Jan 2009 Meeting Accomplishments (1/2) Second Recirculation LB 48 completed. 109 yes votes 22 no votes 6 no votes changed to yes votes in LB48 83.21% approval (as compared to 78.13% in the 1st recirculation LB47) From LB48 a total of 121 comments on Draft 04 (P c-D04_Draft_Amendment.pdf) received 35 technical comments received, all resolved 86 editorial comments received, all resolved Motion approved to request to WG to start 3rd recirculation 3rd recirculation ballot scheduled from 6 Feb (10 days) Draft D05 to be posted by 23 Jan Editorial review ends on 3 Feb A coexistence assurance document produced for and ad for cooperative collaboration Reed Fisher, OKI

5 Meeting Accomplishments (2/2)
Sep 2008 Meeting Accomplishments (2/2) Ballot resolution committee formed consisting of the following members: Bruce Bosco James Gilb Hiroshi Harada Shu Kato Ismail Lakkis Chiu Ngo Two conference calls scheduled: 23 February, 2009, 9 am JST, 22 February, 2009, 4 pm PST, 1 hour and TGad response to coexistence assurance document discussion, 24 February, 2009, 9 am JST, 23 February, 4 pm PST, 1.5 hours Reed Fisher, OKI

6 Record of Motion Ballots
Jan 2009 Record of Motion Ballots Date Slot Doc. Motion Type Proposer Seconder Outcome Jan 19 AM2 08/841 Motion to approve minutes for Dallas meeting Procedural T. Baykas J. Gilb Approved by acclamation 08/856r2 Motion to approve agenda H. Harada F. Kojima Jan 21 AM1 09/064r1 Motion to form ballot resolution committee and decide teleconference date C.S. Sum Jan 22 09/022r5 Motion to accept the changes made in 09/022r4 Motion to submit the coexistence assurance document to Technical S. Kato B. Bosco PM2 08/079r1 Motion to request permission from the Working Group to start recirculation ballot of Draft Standard P c-D04_Draft_Amendment.pdf with the condition that it is first amended with the resolutions in 09/008r4 R. Fisher Reed Fisher, OKI

7 List of Contributions Jan 2009 # Title Doc. # Presented by 1
TG3c opening introduction 09/19r0 R. Fisher 2 Agenda IEEE c 23rd Meeting 09/20r3 3 Coexistence assurance 09/22r2 J. Gilb 4 DF04 Beamforming Related Comment Resolutions 09/27r0 J. Wang 5 SC MCS MR5-Related Comments 09/35r0 C.S. Sum 6 Comment resolutions related to OOK and DAMI modes in DF04 09/36r0 R. Yu 7 Comment resolutions to LB48 for optional OOK/DAMI modes 09/63r0 B. Bosco 8 LB 48 Comments 09/08r3 Reed Fisher, OKI

8 平成31年5月 doc.: IEEE /424r1 Jan 2009 Ballot plan March rd recirculation ballot, 3rd re-circulation comment resolution completed, sponsor ballot started May 2009 – 802 sponsor ballot completed, comment resolution, Recirculation ballot started July – 802 sponsor ballot re-circulation completed and submitted to RevCom for final approval September 2009 – Approval by RevCom Reed Fisher, OKI Stuart J. Kerry - Philips Semiconductors, Inc.

9 TG3c Timeline Jan 2009 Project timeline based on 08/0076r1 2007 2008
10 11 12 1 2 3 4 5 6 7 8 Present all final proposals Present updated/merged proposals x Down Selection started Down Selection finished Draft baseline completed 1st letter ballot completed Resolution of comments completed Re-circulation completed Resolve re-circulation comments 2nd re-circulation completed x  Resolution of the 2nd re-circulation comments completed 3rd re-circulation completed Resolution of the 3rd re-circulation comments completed Sponsor ballot started Sponsor ballot comment resolution. RevCom Approval R. Fisher, Oki Electric Industry co. Ltd

10 Jan 2009 WG Motion To give permission to the c Task Group to start 3rd recirculation ballot of Draft Standard P c- D04_Draft_Amendment.pdf with the condition that it is first amended with the resolutions in 09/008r4 Motion: Reed Fisher Second: Reed Fisher, OKI


Download ppt "平成31年5月 doc.: IEEE 802.11-00/424r1 Jan 2009 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Closing."

Similar presentations


Ads by Google