Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGz Jacksonville Closing Report

Similar presentations


Presentation on theme: "TGz Jacksonville Closing Report"— Presentation transcript:

1 TGz Jacksonville Closing Report
Month Year doc.: IEEE yy/xxxxr0 TGz Jacksonville Closing Report Date: May 15, 2008 Authors: Menzo Wentink (Qualcomm) John Doe, Some Company

2 Accomplishments Resolved 35% of our technical comments (221)
Month Year doc.: IEEE yy/xxxxr0 Accomplishments Resolved 35% of our technical comments (221) Discussed resolutions for security and power saving Added off-channel direct link Approved 3 teleconferences May 27 – topic: usage models June 10 – topic: clause 10 (tentative) July 1 – topic: power save Noon ET Menzo Wentink (Qualcomm) John Doe, Some Company

3 Documents 11-08-0614-00-000z-tgz-jacksonville-meetingminutes.doc
Month Year doc.: IEEE yy/xxxxr0 Documents z-tgz-jacksonville-meetingminutes.doc z-tgz-jacksonville-agenda.ppt z-tgz-lb127-comments.xls z TGz CID ( ).doc z TGz CID ( ).doc z TGz CID ( x).doc z TGz CID (11.z1).doc z-Scheduled-Peer-PSM.ppt z-scheduled-Peer-PSM-new.doc z-tunneled-direct-link-setup-with-channel-switching.doc z-method-for-geting-link-rcpi.ppt z-extended-usage-of-stksa.ppt z-normative-text-for-extended-usage-of-stksa.doc z-normative-text-for-tunneled-rcpi-measurement.doc z-tgz-security-proposal.doc z-peer-power-save-mode-for-tdls-normative-text.doc Menzo Wentink (Qualcomm) John Doe, Some Company


Download ppt "TGz Jacksonville Closing Report"

Similar presentations


Ads by Google