Presentation is loading. Please wait.

Presentation is loading. Please wait.

Spec Framework Decision Process Alternatives

Similar presentations


Presentation on theme: "Spec Framework Decision Process Alternatives"— Presentation transcript:

1 Spec Framework Decision Process Alternatives
Month Year doc.: IEEE yy/xxxxr0 July doc.:IEEE /0836r0 Spec Framework Decision Process Alternatives Date: Authors: John Doe, Some Company

2 Month Year doc.: IEEE yy/xxxxr0 July doc.:IEEE /0836r0 Abstract This contains four alternative pathways for reaching a Taskgroup Approval of the Spec Framework document. John Doe, Some Company

3 Context and Introduction
Month Year doc.: IEEE yy/xxxxr0 July doc.:IEEE /0836r0 Context and Introduction Tgac Selection Procedure (doc 09/0059r4) foresees a Taskgroup vote with 75%+ approval vote on the Spec Framework document Selection Procedure specifies creation of Ad Hoc groups after the Spec Framework has achieved a 75% Approval Taskgroup needs to decide what process to follow to achieve over 75% approval of the Spec Framework This document describes a set of Process Alternatives for discussion Slide 3 John Doe, Some Company

4 TGac Selection Procedure Overview
Month Year doc.: IEEE yy/xxxxr0 TGac Selection Procedure Overview July doc.:IEEE /0836r0 Channel Models Usage Models Functional Requirements Scope of this Presentation Specification Framework Draft Spec Complete and Coherent Enough for Letter Ballot? 75%?) Contributions and Decision Making on Spec Element(s) Sufficient Support for Framework? (75%?) 75% Y Y Letter Ballot N N Slide 4 John Doe, Some Company

5 Process Alternatives Block by Block Taskgroup voting
Month Year doc.: IEEE yy/xxxxr0 Process Alternatives July doc.:IEEE /0836r0 Block by Block Taskgroup voting Sufficient agreement and Taskgroup vote around Core Minimum proposal and block by block Taskgroup voting for additional functional blocks Discussion on additional functional blocks likely to take place in Ad Hoc groups Single Taskgroup vote on a complete set of Functional Blocks Discussion and proposal creation in Ad Hoc groups, voting on Ad Hoc group proposals in entire Taskgroup - Topic Allocation Up front - Additional topics require Taskgroup Procedural vote (50%+) Slide 5 John Doe, Some Company

6 High Level Evaluation of the Options
Month Year doc.: IEEE yy/xxxxr0 High Level Evaluation of the Options July doc.:IEEE /0836r0 Process Alternative Pros Cons 1. Block by Block Taskgroup Voting Full vetting of all possible technologies Probably Takes too long to have TG deliberations for each Functional block 2. Core Minimum TG vote , + Per Block Additional TG votes Focuses debate on contentious issues that require resolution Likely to speed up process Technologies that are not part of Core Minimum likely to face increased scrutiny 3. Single TG vote on ‘Complete Spec Framework’ Can speed up the process High risk that no sufficient support level can be achieved 4. Ad Hoc Groups to Create Proposals, Task-group to Vote on Ad Hoc Group Proposals Relatively efficient and comprehensive vetting of possible technologies May need to update Selection Procedure document This alternative may not achieve sufficient support in the Taskgroup Slide 6 John Doe, Some Company

7 Proposed way forward Discuss Process Alternatives with Taskgroup
Month Year doc.: IEEE yy/xxxxr0 July doc.:IEEE /0836r0 Proposed way forward Discuss Process Alternatives with Taskgroup Identify potential additional alternatives Strawpolls in Taskgroup about Preferred Alternative Motion in Taskgroup about Decision Process Decide on whether Selection Procedure needs to be modified Slide 7 John Doe, Some Company


Download ppt "Spec Framework Decision Process Alternatives"

Similar presentations


Ads by Google