Download presentation
Presentation is loading. Please wait.
Published byJan Raske Modified over 5 years ago
1
WG C – Groundwater Activity WGC-3 Integrated Risk Assessment and Management
Wouter GEVAERTS Thomas TRACK Dietmar MÜLLER
2
Activity WGC-3 (IRAM) OBJECTIVES (Lisbon 2007)
Improved & Integrated Risk Assessment for Groundwater at River Basin Level Update of characterisation under Art. 5 of the WFD (until 2013) Supporting River Basin Management Planning (2nd cycle) Adaptive management ‘lessons learnt’ by implementing the WFD during the last years!
3
Available: Structure proposals Conceptual models Risk Assessment
Activity WGC-3 (IRAM) Available: Structure proposals Conceptual models Risk Assessment Risk Management
4
Activity WGC-3 (IRAM) AIM & SCOPE
Conceptual models Sound system understanding Understanding of impacts and measures Risk Assessment Generic elements, specific WFD-implementation Reviewing risk assessment approaches Refining procedures (including monitoring results) Risk Management Reducing risks, feasible measures at proportionate costs Balancing cost-benefit-aspects Public acceptance
5
Suggestion for a guidance structure
CONCEPTUAL MODEL Suggestion for a guidance structure 1 Introduction 2 Definitions 3 Basic CM procedure 4 Aims 4.1 Questions to be answered by a CM 4.2 Spatial & temporal scale 4.3 Processes to be considered 5 Data 5.1 Data needs 5.2 (existing) Data review 5.3 Data collection/acquisition 6 Conceptual model set-up 6.1 Groundwater 6.2 Interaction unsaturated zone & surface water 6.3 Affecting drivers, pressures, mechanisms 7 Validation of CM 8 Application of CM 8.1 CM in risk assessment 8.2 CM in risk management
6
4 Review of Environ-mental Impacts
Risk Assessment Guidance structure 1 Aim and Scope 2 Generic elements relation to RM Source-pathway-receptor overview data needs Extent of impact Probability of occurrence acceptability and tolerability 3 Groundwater RA 4 Review of Environ-mental Impacts Quality & quantity Surface water correlation Relevant contaminants, transformation & transp. extent/significance of impacts Uncertainties Conceptual Model Sampling and analysis Confidence levels
7
5 Resources, services and uses
Risk Assessment Guidance structure 5 Resources, services and uses Relevant receptors GW-body management objectives 6 Revision Art. 5 reports 7 Risk Characterisation Status & trend assessment Objectives vs. impacts rough options of measures Inventory & Comparison existing approaches IMPRESS Guidance groundwater RA (WG C workshop report 2004) (Art. 5 reports) how to include considerations on monitoring and status assessment examples risk/exposure assessment models
8
3 Risk characterisation
Risk Management Guidance structure 1 Aim and Scope 2 General framework relation to RA; analysis & translation of knowledge (and “non-knowledge”) Informed evaluation of risks& generating options evaluation Options, economic impacts public participation, decisions and implementation monitoring & feedback 3 Risk characterisation Collecting, reviewing & summarizing Gaps by 2015 risk reduction options recharge zone reactive zone towards the receptor Combined strategies Confidence & uncertainties
9
Guidance structure 6 PoM (measures) 7 Review RBMP Risk Management
4 Preparing decisions effectiveness, efficiency secondary impacts legal requirements stakeholder consultation Evaluation and selection 5 Draft management plans status compliance assessment measures cost-benefit analysis public participation 6 PoM (measures) Basic measures Additional measures monitoring feedback to planning adaptive management approaches 7 Review RBMP Rework RBMP by 2013 Adapting during 2nd cycle
10
DG Leader meeting WG C-3 in Mechelen, 9/10 July 2008
Activity WGC-3 (IRAM) DG Leader meeting WG C-3 in Mechelen, 9/10 July 2008 discussion of merging the 3 lines of action into 1 document discussion of working mode and further procedure
11
Risk Management (techn. report)
Activity WGC-3 (IRAM) 2009 focused effort on Risk Assessment and Conceptual Modeling (preferred!) Risk Management (techn. report) as a separate working issue for 2010 specific topic on cost-benefit-analysis
12
Meetings Activity WGC-3 (IRAM) 2 Activity meetings
February: Drafting Group meeting (Vienna) early autumn 2 meetings in parallel to WG C plenary (28.04 Prague, November Sweden) draft “integrated risk assessment and adaptive management“ approved by end of the year
13
Questions to the Paris WG C plenary :
Activity WGC-3 (IRAM) Questions to the Paris WG C plenary : agreement on the proposed change of scope agreement on revising the work plan WG C members interested to participate on Act. 3 for working on Risk Assessment and Conceptual Modeling by 2009
14
WG C – Groundwater Activity WGC-3 Integrated Risk Assessment and Management
THANKS!
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.