Download presentation
Presentation is loading. Please wait.
Published byCarole Lebel Modified over 5 years ago
1
Objectives Proposed Network European RIS Example Project Plan
OHIO River-Net Objectives Proposed Network European RIS Example Project Plan
2
Objectives 1 2 3 4 2 Network infrastructure specification
Potential business applications ROI analysis Computer simulations of the most important applications 2
3
Understanding Players
USACE USCG OHIO RIS Barge Lines PPC Terminal Operators Shippers/ Receivers
4
Proposed Network
5
European RIS Features Fairway Information Services Waterway
Charges & Dues Traffic Management Cargo Management Calamity Abatement Service Port &Terminal Management
6
Fairway Information Services
RIS Features Fairway Information Services Provide information about the use and status of the inland waterway infrastructure Support strategic navigation decision-making (plan and monitor a trip). Target User: Barge lines
7
Traffic Information and Management Services
RIS Features Traffic Information and Management Services Strategic/tactical traffic information Waterway administration for safe navigation Vessel Traffic Service (VTS) Accidents prevention by means of shore based monitoring Lock and Bridge Planning Reduction of waiting time and smoothing of the traffic flow Target User: Barge Lines, USCG
8
Calamity Abatement Service
RIS Features Calamity Abatement Service Register vessels at the beginning of each trip and update data during the voyage In case of accident, immediate and expedited measures to rescue the vessels thanks to the data Target User: Barge Lines, USCG
9
Port and Terminal Management
RIS Features Port and Terminal Management ETA( Estimated Time of Arrival) information of approaching vessels supports the overall terminal utilization and smooth passage of vessels Reduction for transshipment time In case of insufficient terminal capacities, the terminal operator inform his Requested Time of Arrival (RTA). Target User: Barge Lines, Terminal Operator
10
Cargo and Fleet Management
RIS Features Cargo and Fleet Management Detailed information on the cargo transported Information on the vessels and the fleet Target User: Barge Lines, USACE
11
Waterway Infrastructure Charges and Harbor Dues
RIS Features Waterway Infrastructure Charges and Harbor Dues Use of voyage data to automatically calculate charge and initiate invoicing procedures Target User: Government
12
Identify Business Services
Project Plan Post Demo Review Demo ROI Identify Business Services Design Network Infra. Requirement Analysis Scope Definition
13
CMU River-Net Project Member List
Name Name (Eng) Cell Phone Sunkyung Park Sunny Sungju Cho Joe Yunsuh Chun Yun Hyeon Yu Shawn Hyunsu Jun Sue Yi-Chan Ho Yi-Chan
14
Thank You ! Q&A
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.