Presentation is loading. Please wait.

Presentation is loading. Please wait.

Expert Group on Reporting , Brussels

Similar presentations


Presentation on theme: "Expert Group on Reporting , Brussels"— Presentation transcript:

1 Expert Group on Reporting 22.11.2012, Brussels
Agenda points 5-9 Expert Group on Reporting , Brussels © O. Opermanis

2 5. State of reporting tools
Reporting tool for Art 17: ready since Reporting tool for Art 12: ready since Range tool is available xml schema is available

3 Corrections to the Frontend of Art 17 Reporting tool
Export function. MS need to replace frontend to be able to export checklist in a correct format QA/QC: not to flag missing entries in case of absent data (method used = 0) Lookup table of threats, concerning “Unknown-U”. MS to re-enter “U” if feasible, otherwise post-submission QA/QC shows an error & can be solved at that stage too. Potentially corrections to Art 12 tool as well  Corrected Frontend & guidance will be made available at Reference Portals

4 Further training needs on tools
Your view on this?

5 6. Rules for accepting MS deliveries
A note is provided to the Expert Group Rules aim to avoid problems in later stage of delivery (esp for MS developing their own tool) Rules include only those data issues which prevent the data from being used

6 Proposed simple rules:
not all requested xml and GIS files are provided xml files do not follow requested schema as presented on the Reference Portal no projection file provided spatial dataset has to be in the projection ETRS 5210 LAEA basic data standard requirements not followed  Delivery note from EC to MS will include explanation on these rules and practicalities

7 7. Ideas about scoreboard
scoreboard on timeliness and quality of MS reports to be placed on DG ENV website

8 Two examples WFD:

9 MSFD:

10 8. Corrections to the Art 12 and Art 17 Guidelines
Format for number in chapter “Quick reminders”. No 1000 separator should be used. Step-by-Step Guidance for Art 17. Year or period: YYYY or YYYY-YYYY is the correct format.  Will be added to the Reference Portals

11 9. Issues from MS side? Threats and pressures, Art 12 (UK)
UK proposal: to report only current pressures in 2013?

12 Number of questions to ETC (bilateral response or FAQ)
List of threats and pressures & Art 12 reporting – difficulties to find precise entries Number of questions to ETC (bilateral response or FAQ) Future prospects Reporting period Degraded raised bogs Hybrids Interpretation of habitat type like 3110 & 3130

13 Thank you for your attention
© O. Opermanis


Download ppt "Expert Group on Reporting , Brussels"

Similar presentations


Ads by Google