1 Fueling the Future of the Fairbanks North Star Borough
April 18, 2019

2 Interior Energy Project PURPOSE AND GOALS Interior Alaska
“. . . to bring low-cost energy to as many residents and businesses of Interior Alaska as possible, as quickly as possible ...” Stabilize the Economy Help Improve Air Quality

3 Large LNG Storage Tank Construction
5.25 Million gallon capacity Full-Containment, Double wall design Construction Commenced January 2018 Advancing On-schedule Completion Date estimated Fall 2019 Construction Costs $58.4 Million

4 LNG Storage and Vaporization Activities
Fairbanks Tria Road 5.25MM Gallon Storage Project Final Inner Tank Ring placement and welding complete. Outer Tank staircase complete. Balance of Plant Phase IV contract Award issued to Price Gregory. Project currently on Schedule Begin filling in October – November, 2019

5 LNG Storage and Vaporization Activities
Fairbanks

6 December 2017 – September 2018 Video removed due to size constraints.

7 North Pole Storage Video removed due to size constraints.

8 North Pole Storage Design of the $12.1 Million LNG storage facility in North Pole is complete and a Request for Proposals was issued February 14, 2019. The storage facility will have two 75,000 Gallon storage tanks and a multi purpose building and will be connected to the previously constructed 73 miles of pipe infrastructure in the North Pole area. Bid responses are in final evaluation with a decision to be made in the next few weeks on recommended next steps.

9 Braemar Technical Services
Titan FEED Braemar Technical Services have been engaged to conduct the front-end engineering and design (FEED) for the expansion of the Titan liquefied natural gas facility. Braemar Technical Services

10 65% Design Project Braemar is preparing RFP’s for liquefaction and pretreatment vendors, for LNG storage tanks, new truck loading rack Working on a power study Significant amount of the Balance of Plant Engineering by Coffman Engineers in Anchorage Completion of FEED study June 2019

11 Coverage Area

12 Installed Piping Fairbanks

13 Installed Piping North Pole

14 811- Call BEFORE You Dig Planning to: Put in a fence? Install a mailbox? Build a patio or deck? Plant trees or shrubbery? Excavate a new garden area? Install or maintain a septic system? Install a well? Call the Alaska Digline at 811 at least 72 hours (3 Days) prior to digging and get your underground utility lines located and marked for free.

15 Questions