PARK WEST DRAIN Park Township, Ottawa County, Michigan Project Information Meeting August 4, 2011 Ottawa County Drain Commissioner
2
PARK WEST DRAIN Final Route Project Schedule Estimated Cost Apportionment Methodology
3
FINAL ROUTE Outlet at Winstrom Creek Perry St 168 th Ave Riley St Greenly St Quincy St Estate Dr 160 th Ave
4
FINAL ROUTE 21 Easements Project Length Trunkline Pipe – 5.5 Miles Branch Pipe – 2.5 Miles Ditches – 7.5 Miles Total – 15.5 Miles
5
PROJECT SCHEDULE Three Phases
6
PROJECT SCHEDULE Phase I Spring 2012 Work Includes: Perry St 168 th Ave Power Line Easement Portions of Riley St, Greenly St, & 160 th Ave
7
PROJECT SCHEDULE Phase II Winter 2012-2013 Work Includes: Ottawa Beach Rd Crossing Sediment Basins
8
PROJECT SCHEDULE Phase III Spring 2013 Work Includes: Inlets on 168 th Ave Riley St Greenly St Quincy St Estate Drive 160 th Ave
9
ESTIMATED COST $5.9 million Construction Engineering Easement/Property Acquisition Legal/Administrative Costs
10
APPORTIONMENT METHODOLOGY Costs paid by: Park Township at-large Ottawa County at-large Landowners
11
APPORTIONMENT METHODOLOGY Benefit Factors Location Land Use Parcel Size Stormwater Management
12
APPORTIONMENT METHODOLOGY Apportionment will be based on: Acreage Within District Composite Benefit Factor