Pad mounted 120/240 open 4 wire service

Similar presentations


Presentation on theme: "Pad mounted 120/240 open 4 wire service"— Presentation transcript:

1 Pad mounted 120/240 open 4 wire service

2 OSHA Required Tailgate Discussion Topics
Hazards Associate with the job Work Procedures Involved Special Precautions Energy Source Controls PPE Required The five topics required by OSHA to discuss in the tailgate. First letter from each topic = How Well Should Everyone Plan

3 Work Procedures Involved Hazards associated with the job
Special Precautions Energy Source Controls Personal Protective Equipment Be sure to record your emergency location and post in a location everyone on the crew knows. Have your PPE and First Aid kit available Be sure your AED is accessible. A safe job begins with a thorough inspection of… Tools Be certain all of your tools are in good shape. Equipment Make sure your trucks are all in working order take time to preflight your equipment and insure there are no surprise. Line/Structure Look over the line and structure. Are there any potential hazards? (Broken insulators, damaged wire, clearances over roads or from trees?) Be aware of your work area, be sure to cover anything you can reach touch or fall into. And anything that can reach touch or fall into you! Discuss all PPE needed for the job and wear your PPE. Be sure to inspect your equipment prior to use. Identify all voltages you are exposed to. Be sure to have all of your Arc-Flash protective gear on. Identify a dedicated observer Working in traffic exposes you to hazards that are difficult to control. Give the vehicles plenty of time to see and avoid you! Follow the manual of traffic control for your area. Slips trips and falls are some of the most common injuries, look for hazards that could cause this. Be sure to inspect and wear your fall arrest harness. Here are the five topics again with signs and bubbles to jump start tailgate discussion!! Click on the icon to bring up a text box. Click on the icon again to make the text box go away Gets the crew involved. Gives the feeling of knowing it is ok to ask questions, give suggestions, see something, say something! The next slides will get directly into the task at hand. Visual, written and audio will all be used here! There are suggestions in the notes as to what to discuss. This will get the Team involved, creating communication channels to open!

4 The overhead and underground transformers are the same inside
The overhead and underground transformers are the same inside. Note that the location of the X2 on the pad mounted transformer is on the bottom and not in the middle.

5 Set the Two transformers next to each other

6 Decide what one will provide the lighting load.
Lighting Transformer

7 Be certain the tank grounding strap is disconnected on the X2 bushing of the non-lighting transformer Lighting Transformer

8 Make your Ground connections
Make your Ground connections. Do Not Connect a ground to the X2 of the non-lighting transformer. Lighting Transformer

9 Connect the secondary neutral.
Lighting Transformer

10 Connect the X1 of the lighting transformer to the X3 of the other transformer.

11 Connect the X1 of the lighting transformer to one of the service lighting legs.

12 Connect the X3 of the lighting transformer to other of the service lighting legs.

13 Connect the X1 of the non-lighting transformer to last of the service lighting legs. This will be the wild leg. Lighting Transformer

14 Connect one primary phase to the lighting transformer.

15 Connect a different phase primary to the non-lighting transformer.

16 Connect a different phase primary to the non-lighting transformer.