Download presentation
Presentation is loading. Please wait.
1
TEP’S RAS MODELING for POWER WORLD
By Kathy Estrada Tucson Electric Power
2
Background Location System Description TOLS
3
Injection Groups Load shed zone Model Explorer Aggregations
Advanced filters Right click – Insert Right click again Insert Select category Select element Add
4
Model Conditions Setting RAS activating conditions Model Explore
*This will be changed to areas and voltage limits instead of TEP lines Case Information and Auxiliary Right click – Insert Set filter Branch Company Set conditions Name the condition
5
Model Filters Stating the criteria for the actions taken to alleviate the conditions defined in Model Conditions Model Explore Case Information and Auxiliary Model Filters Right click – Insert Choose conditions Name your scheme
6
Create contingencies Determining which contingencies will cause the scheme to activate Right click – Insert Add new element Run Mode Save Tools Name Contingency analysis
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.