Presentation is loading. Please wait.

Presentation is loading. Please wait.

Clark, K. B. and T. Fujimoto (1991)

Similar presentations


Presentation on theme: "Clark, K. B. and T. Fujimoto (1991)"— Presentation transcript:

1 Clark, K. B. and T. Fujimoto (1991)
2011 Fall Seminar on Technology Innovation Product development performance : strategy, organization, and management in the world auto industry Clark, K. B. and T. Fujimoto (1991) 기술경영학협동과정 이기영 오신호

2

3 Contents Summary 1 Discussion 2

4 in Product Development
R&D Production Design Build Prototype as problem detectors vs. Proving product design Test Product Ramp Up Drawing CAD Building Tools Dies Basic Research Communication Lead Time Pilot Test Leadership & Organization 제품 하나를 생산하는데, 시작부터 마칠 때 까지 의 소요 시간(기간)을 의미합니다. (제품의 기획에서 완성단계의 기간) Manufacturing Capability Success in Product Development Integrating Problem- Solving Cycles

5 1. Summary □ How can we improve product development performance?
This Paper proves Japan car makers have more productive capability than U.S. and European firms due to hidden manufacturing capability, integrating problem solving cycles, and leadership & organization Chapter 7 Chapter 8 Chapter 9 • R&D vs. Production - Dynamism, Flexibility, Creativity, Loose Control - Stability, Efficiency, Discipline, Tight Control • Hidden Manufacturing Acts. - Prototype fabrication - the building tools and dies - Pilot run implementation • Problem-Solving Cycle - Problem Recognition - Alternative Generation - Evaluation - Decision Making • Stage Overlapping & intensive Comm. - Production E.O.S - Informational E.O.S - Network Externalities • Problem Solving in the Upstream & down Stream • Product Development Organization - Specialization - Internal Integration - External Integration • The role of Product Manager - Light weight System - Heavy weight System

6 2. Discussion Discussion Future Studies
What will the good strategy to improve product development performance 1) Pilot Projects : Prototypes Quality 2) Overlapping Communication : R&D - Production 3) Leadership : Heavy weight System • Spending too much time on a planning or pilot projects will be good? Luck Future Studies Product or outcome development in public sectors

7 Thank you


Download ppt "Clark, K. B. and T. Fujimoto (1991)"

Similar presentations


Ads by Google