Presentation is loading. Please wait.

Presentation is loading. Please wait.

May, 2010 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for MBAN Study Group, May 2010.

Similar presentations


Presentation on theme: "May, 2010 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for MBAN Study Group, May 2010."— Presentation transcript:

1 May, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for MBAN Study Group, May 2010 Meeting Date Submitted: May 20, 2010 Source: Raymond Krasinski, Philips 345 Scarborough Road, Briarcliff Manor, NY 10510 Voice: , FAX: , Abstract: Closing report for MBAN Study Group Purpose: To outline the progress of the group during the May 2010 Interim meeting Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Raymond Krasinski, Philips

2 1st Meeting of the MBAN Study Group
May, 2010 IEEE MBAN SG Closing Report 1st Meeting of the MBAN Study Group Beijing, China May 17-20, 2010 Raymond Krasinski, Philips

3 May, 2010 Mission of MBAN SG Study the prospects of an amendment of for MBAN If a task group is created it is expected to define any modifications required to the existing PHY and the possible modifications to the MAC needed to support the PHY that complies with the FCC MBAN regulations Generate a draft MBAN PAR and 5C Prepare a report to accompany PAR and 5C Raymond Krasinski, Philips

4 May 2010 Meeting Progress Introduced the group
Presented background information Began discussions of the PAR and 5C Discussed how we move forward Raymond Krasinski, Philips

5 Discussion Progress Good discussions in first meeting
May, 2010 Discussion Progress Good discussions in first meeting Defining difference between MBAN and TG6 will be a key action for SG MBAN MBAN scope limited to US FCC rules Progress slowed by lack of draft rules Difficulty fully defining scope until FCC requirements are clarified Raymond Krasinski, Philips

6 May, 2010 Planning Joint TG6-MBAN session planned for next meeting (San Diego, July 2010) Circulate Updated PAR for comments well before next meeting on reflector Continue PAR and 5C discussions in San Diego Conference calls before next meeting Raymond Krasinski, Philips

7 May, 2010 Thank you! Raymond Krasinski, Philips


Download ppt "May, 2010 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for MBAN Study Group, May 2010."

Similar presentations


Ads by Google