Presentation is loading. Please wait.

Presentation is loading. Please wait.

Proposed ACI Modifications

Similar presentations


Presentation on theme: "Proposed ACI Modifications"— Presentation transcript:

1 Proposed ACI Modifications
Month Year doc.: IEEE /0442r1 Month YearMarch 2007 Proposed ACI Modifications Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at M. Kobayashi, Broadcom Corp John Doe, Some Company

2 Month Year doc.: IEEE /0442r1 Month YearMarch 2007 Abstract Overview of proposed modifications to the P recommended practice to resolve task group comments numbers: 101,102,103,104,105,106,107,108,109,110, 118,170 M. Kobayashi, Broadcom Corp John Doe, Some Company

3 Original ACI Test Block Diagram
Month YearMarch 2007 Original ACI Test Block Diagram ACI block diagram Conducted version Based roughly on conducted environment as specified in the draft but with modifications specific to ACI performance measurements Test Controller Control of Attenuators Control of Traffic Generator and Analyzer Control of Power Meter Traffic Generator Traffic Analyzer Power Meter WLCP (Inband) Attenuator DUT (client) Attenuator Attenuator mux AWG WLCP (jammer) Attenuator WLCP (client jammer) Legend: ______ RF cables ______ Non-RF data paths ______ Control Cables Terminator Directional coupler Circulator M. Kobayashi, Broadcom Corp

4 ACI Test Block Diagram with WLCP jammer
Month YearMarch 2007 ACI Test Block Diagram with WLCP jammer ACI block diagram Conducted version Based roughly on conducted environment as specified in the draft but with modifications specific to ACI performance measurements Test Controller Control of Attenuators Control of Traffic Generator and Analyzer Control of Power Meter Traffic Generator Traffic Analyzer Power Meter WLCP (Inband) Attenuator DUT (client) Attenuator WLCP (jammer) Attenuator WLCP (client jammer) Legend: ______ RF cables ______ Non-RF data paths ______ Control Cables Splitter/Combiner Directional coupler Shielded box Terminator Isolator M. Kobayashi, Broadcom Corp

5 ACI Test Block Diagram with AWG jammer
Month YearMarch 2007 ACI Test Block Diagram with AWG jammer ACI block diagram Conducted version Based roughly on conducted environment as specified in the draft but with modifications specific to ACI performance measurements Test Controller Control of Attenuators Control of Traffic Generator and Analyzer Control of Power Meter Traffic Generator Traffic Analyzer Power Meter WLCP (Inband) Attenuator DUT (client) Attenuator AWG Legend: ______ RF cables ______ Non-RF data paths ______ Control Cables Splitter/Combiner Directional coupler Shielded box Terminator M. Kobayashi, Broadcom Corp

6 Original Calibration Month YearMarch 2007 Calibration Procedure PM A B
Test Controller Control of Attenuators Control of Traffic Generator and Analyzer Control of Power Meter Traffic Generator Traffic Analyzer Calibration Procedure Measure path loss from every point to point A enumerated as B to A, C to A, D to A and E to A Measure path loss from every point to powermeter (PM) enumerated as B to PM, C to PM, D to PM and E to PM Measure path loss from C to B with attenuator set to 0 Basic idea is to measure power at point A given input from any source. PM Power Meter A WLCP (Inband) Attenuator DUT (client) Attenuator B Attenuator D mux AWG C WLCP (jammer) Attenuator WLCP (client jammer) E Legend: ______ RF cables ______ Non-RF data paths ______ Control Cables Terminator Directional coupler Circulator M. Kobayashi, Broadcom Corp

7 Calibration of ACI setup with WLCP jammer
Month YearMarch 2007 Calibration of ACI setup with WLCP jammer Calibration Procedure Measure path loss from every point to point A enumerated as B to A, C to A, and D to A Measure path loss from every point to powermeter (PM) enumerated as B to PM, C to PM, and D to PM Basic idea is to measure power at point A given input from any source. Test Controller Control of Attenuators Control of Traffic Generator and Analyzer Control of Power Meter Traffic Generator Traffic Analyzer Power Meter PM A WLCP (Inband) Attenuator DUT (client) Attenuator B D C WLCP (jammer) Attenuator WLCP (client jammer) Legend: ______ RF cables ______ Non-RF data paths ______ Control Cables Splitter/Combiner Directional coupler Shielded box Terminator Isolator M. Kobayashi, Broadcom Corp

8 Calibration of ACI setup with AWG jammer
Month YearMarch 2007 Calibration of ACI setup with AWG jammer Calibration Procedure Measure path loss from every point to point A enumerated as B to A, and C to A Measure path loss from every point to powermeter (PM) enumerated as B to PM, and C to PM Basic idea is to measure power at point A given input from any source. Test Controller Control of Attenuators Control of Traffic Generator and Analyzer Control of Power Meter Traffic Generator Traffic Analyzer Power Meter PM A WLCP (Inband) Attenuator DUT (client) Attenuator B C AWG Legend: ______ RF cables ______ Non-RF data paths ______ Control Cables Splitter/Combiner Directional coupler Shielded box Terminator M. Kobayashi, Broadcom Corp


Download ppt "Proposed ACI Modifications"

Similar presentations


Ads by Google