Presentation is loading. Please wait.

Presentation is loading. Please wait.

Job Performance Requirement 10-33

Similar presentations


Presentation on theme: "Job Performance Requirement 10-33"— Presentation transcript:

1 Job Performance Requirement 10-33
Wildland Hose Advancing and Extension

2 A A preconnected line is pulled to begin the hose lay.
As the line is moved forward, it is operated for suppression and crew protection. JPR 10-33A

3 B When the line is almost fully extended, a second
line is rolled back in preparation for the next length. JPR 10-33B

4 C With the line clamped, the nozzle is removed and placed on the new length, and the hoses are connected. JPR 10-33C

5 D The clamp is released and the line advanced.
When the line is again fully extended, the team repeats the clamping and extending process. As wildland hose is typically of smaller diameter than structural firefighting hose, it is easier to clamp. JPR 10-33D


Download ppt "Job Performance Requirement 10-33"

Similar presentations


Ads by Google