Presentation is loading. Please wait.

Presentation is loading. Please wait.

MC production plans : 1/08/ /03/2001

Similar presentations


Presentation on theme: "MC production plans : 1/08/ /03/2001"— Presentation transcript:

1 MC production plans : 1/08/2000 - 31/03/2001
Agnieszka Jacholkowska 05/07/2000 A. Jacholkowska

2 A. Jacholkowska LHCb SoftwareWeek
TDRs (1) End July 2000 : CALOs 280k events on RAWH, DST1 RICH 230k events on RAWH, DST1 Muons (TDR end 2000+) new version SICBMC and SICBDST - August 2000 detailed geometry, x-talk, timing, ...  Test Data 50k - 100k events RAWH and DST1 (mostly mbias and B   X) final production - October 2000 50k - 100k events RAWH and DST2 (mbias, B   X, B  J/(  ) K0s ) 05/07/2000 A. Jacholkowska LHCb SoftwareWeek

3 A. Jacholkowska LHCb SoftwareWeek
TDRs (2) Trigger (TDR 2002) L0 CALOs no production foreseen with present software (no noise,…) Muons comprised in the Muon TDR sample L1 - Autumn 2000 request from F. Fiedler (April 2000), for CERN and Lyon, 500k events with DST2 output - channels and mbias Comments on latest calculations on trigger samples (O. Schneider) obviously for later period calculations driven by 0.1% bandwidth for photons (?) before : we have to clarify running conditions for luminosity and trigger thresholds  discussion needed - Milano meeting ? 05/07/2000 A. Jacholkowska LHCb SoftwareWeek

4 A. Jacholkowska LHCb SoftwareWeek
TDRs (3) Tracking (TDR outer tracker - March 2001) new SICBMC (tracking part) will need 60k events in RAWH and DST format reconstructed by BRUNEL, (see BRUNEL meeting) n x specialized samples of 1000 events before end 2000 Vertex Detector (TDR - April 2001) 05/07/2000 A. Jacholkowska LHCb SoftwareWeek

5 A. Jacholkowska LHCb SoftwareWeek
Physics Channels all channels in TP and SM Workshop will be provided on request from analysers , many already exist in RICH TDR sample b inclusive background 500k events (RAWH format) from RAL, reconstructed at CERN ? production of M events after L0/L1 triggers in MiniDST format at Liverpool farm is under discussion 05/07/2000 A. Jacholkowska LHCb SoftwareWeek


Download ppt "MC production plans : 1/08/ /03/2001"

Similar presentations


Ads by Google