Download presentation
Presentation is loading. Please wait.
Published byEva Pfeiffer Modified over 5 years ago
2
Lesson 4 Improve the Process
3
Objectives You will be able to understand:
The advantages of continual process improvement The key activities associated with process improvement
4
5. Repeat step 1 with new knowledge
Improve the Process 4. Act on what was learned 1. Plan a change for improvement ACT PLAN CHECK DO 3. Analyze and interpret effects of the change 2. Carry out the change on a small scale 5. Repeat step 1 with new knowledge 6. Repeat step 2 and onward
5
The Batavia Incident Offshore: Less variation Batavia: More variation
10 20 30 40 50 60 70 80 90 LSL USL Target
6
Specifications as Goals
Loss No Loss Loss (Bad) (Good) (Bad) Does not meet customer expectations Does not meet customer expectations Meets customer expectations LSL Target USL Measure of quality characteristic
7
Quality Loss Function Increasing Value Lost Increasing Value Lost
Curve LSL Target USL Measure of quality characteristic
8
Continual Improvement and the Quality Loss Function
Distributions A B C Value Lost Increasing Value Lost Increasing Loss A Loss B Loss C Loss B Loss A LSL Target USL Measure of quality characteristic
9
Activity 4.1 Plan ACT PLAN CHECK DO
Plan what changes might lead to improvements Decide what data are needed Determine how, when, and by whom data will be collected ACT PLAN CHECK DO
10
Cause & Effect Diagram Equipment Methods Reliable elevators Better
tools Assembly procedures Better training Skids & yellowgear Better training Weapons movement Reduced weapons assembly and delivery time Assembly jigs Better training Pre-assembled Components Closer storage spaces Improved watchbill Better/faster elevators Fewer weapons types Lights& ventilation Training priority Better “C” schools Grease Viscosity Straight thru elevators People Materials Environment
11
Activity 4.2 Do ACT PLAN CHECK DO Gather or review baseline data
Make planned changes on a small scale Gather data to determine what happened after the changes
12
Activity 4.3 Check ACT PLAN CHECK DO
Compare results of changes with what was planned Determine whether changes led to improvements CHECK DO
13
Activity 4.4 Act ACT PLAN CHECK DO Decide on changes Make the changes
Standardize Educate & train Monitor the process Repeat the cycle ACT PLAN CHECK DO
14
PDCA Cycle & Process Improvement
Decide on changes Make the changes Standardize Educate & train Monitor the process Repeat the cycle Plan what changes might lead to improvements Decide what data are needed Determine how, when, and by whom data will be collected ACT PLAN Compare results of changes with what was planned Determine whether changes led to improvements CHECK DO Gather or review baseline data Make planned changes on a small scale Gather data to determine what happened after the changes
15
Leadership Involvement
Study & learn PDCA Actively participate in quality improvement Develop a TQL implementation plan Choose initial efforts that are: - Customer or mission-driven - Likely to succeed - Measurable - Designed with strategic intent
16
TQL Teams & Activities ESC QMB PAT A P C D 1.1 Clarify The Mission
(only if required) 1.1 Clarify The Mission Clarify the Charter Task (or Charter) a PAT Train ESC Build commitment in ESC Write Implementation Plan 2.1 Describe the Process 2.2 Simplify, & 2.3 Standardize the Process PAT ID & Prioritize: 1.2 Org’s Customers 1.3 Customer Reqmts 1.4 Significant Processes 3.1 Determine Measures Assist the QMB 3.2 Construct Control Chart 2.1 Describe Processes Charter QMBs Stable ? No 3.3 Act on Special Causes Help with Flow Chart Collect data ID & remove special causes Provide ideas Assess the Organization Develop Critical Mass Create the Environment Refine Mission Improve the TQL Impl Plan Support and Extend CPI Yes 4.4 4.1 A P 3.4 Check for Capability 4.3 4.2 C D (MOM 6)
17
Summary of Key Activities
Identify 1.1 Clarify the mission 1.2 Identify & prioritize customers 1.3 Identify & prioritize customer requirements 1.4 Identify significant processes that meet customer requirements Simplify & Standardize 2.1 Describe the process 2.2 Simplify the process 2.3 Standardize the process Stabilize 3.1 Determine process measures 3.2 Examine the process by using control charts 3.3 Act on special causes 3.4 Check for capability Improve 4.4 ACT 4.1 PLAN 4.3 CHECK 4.2 DO
18
Chapter Summary Process improvement is a job for everyone
Process improvement must be continual Process improvement affects organizational systems You are responsible for leading process improvement
19
Summarize Your Responsibilities for Implementing TQL
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.