Download presentation
Presentation is loading. Please wait.
1
New Medical Facility Building
By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design II
2
introduction Our senior project involved completing the development of a theoretical medical building. We have completed the working drawings using AutoCAD. Completed a project schedule using Primavera software. Determined the building and fire codes. Determined the site location. Conducted an elevation survey of the site. Made a quantity take-off, also known as an estimate.
3
Working Drawings
4
WORKING DRAWINGS
5
WORKING DRAWINGS
6
Working drawings
7
Working drawings
8
Working drawings
9
WORKING DRAWINGS
10
Exterior finishes Roof Wall Finish Trim Pieces “S” tile roof
Stucco (Decorative wall finish) Owner will select color Trim Pieces 2x8 Fascia 2x2 Window Trim
11
Project schedule We used the Primavera software in order to create a bar chart. It is basically a flowchart of each task needed to complete this building.
12
Building codes The building codes come from the Hammond Zoning Ordinance booklet. Part 1: Principles and Objectives Section Commercial 1.306 Part 3: Schedule of District Regulations Adopted Section 3.8 – C-1 Commercial District 3.805 3.806 3.807 Part 5: Off-Street Parking and Loading Requirements Section 5.3 – Commercial 5.301 Section 5.6 – Off-Street Loading Requirements 5.601
13
Fire codes The fire codes came from the NFPA 101 Life Safety Code booklet. Chapter 26: New Building Occupancies Section 26-1: General Requirements 26-1.7 Section 26-2: Means of Egress Requirements 26-2.4 26-2.6 26-2.8 Section 26-3: Protection 26-3.5
14
Location The location is on Professional Plaza
Near downtown Hammond and I-12 interstate Two adjacent lots 0.5 acres for $99,000 0.75 acres for $125,000 Total lot size and price 1.25 acres $224,000
15
Elevation survey of location
A survey was taken of the location using elevation points. These points are on a 40’ grid pattern across the whole property.
16
Building materials Estimate
Preliminary estimate cost: $261, $297,250 $110 - $125 per square foot Actual Estimate: $284,460.87
17
Building materials Estimate
18
Timeline/Deliverables
Week 1-2 1/20/15 – 2/3/15 Determine a project and the tasks involved Week 3-4 2/4/15 – 2/18/15 Determine a site location and cost of the property Week 5 2/19/15 – 2/26/15 Specify the building codes Week 6 2/27/15 – 3/6/15 Specify the fire codes Week 7 3/7/15 – 3/14/15 Work on preliminary drawings; floor plan and elevation plans Week 8 3/15/15 – 3/22/15 Work on proposal document and presentation Week 9-13 3/23/15 – 4/27/15 Begin estimation for materials Week 14-15 4/28/15 – 5/8/15 Prepare final document and presentation Last Semester This Semester Week 1 8/24/15 – 8/28/15 Discussed what we did last semester and what is expected for this semester Week 2-3 8/31/15 – 9/11/15 Work on proposal document and presentation Week 4 9/14/15 – 9/18/15 Revise preliminary drawings and begin working on the working drawings Week 5 9/21/15 – 9/25/15 Finalize working drawings using AutoCAD Week 6-8 9/28/15 – 10/16/15 Begin estimation for materials Week 9 10/19/15 – 10/23/15 Finalize quantity take-off Weeks 10-12 10/26/15 – 11/13/15 Begin project schedule using Primavera Weeks 13-14 11/16/15 – 11/27/15 Begin elevation survey Week 15 11/30/15 – 12/4/15 Prepare final document and presentation
19
ANY QUESTIONS?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.