Presentation is loading. Please wait.

Presentation is loading. Please wait.

Fresh Air Base Statement

Similar presentations


Presentation on theme: "Fresh Air Base Statement"— Presentation transcript:

1 Fresh Air Base Statement
Welcome to the GreeneCo., Waynesburg Mine Thank you for responding to our emergency. This mine was in the process of reopening. It is a shaft mine with dual intake and return. The reopening plan ordered by the State and the Federal mandated that boreholes be drilled and then mine rescue teams explore the areas at the bottom of the shaft prior to any work being done. This was completed 2 weeks ago. Last night 5 miners were underground, when the monitoring system alerted the outside person to high CO levels. An attempt was made to enter the mine using the elevator in the air shaft, however the elevator was disabled by the event. When she could not reach anyone underground, she immediately began calling everyone on the Emergency Notification List. Since then, the elevator has been restored to working condition. The elevator and the main intake shaft have been explored and inspected and are in proper working order. You are located at the fresh air base on the surface. Once you are under apparatus, you will be escorted to the elevator. There is a door at the bottom of the elevator/airshaft, once it opens, you will be in the mine. You cannot use or disassemble any ventilation materials on the airshaft or overcasts if found. All underground work must be done by your team. A back up mine rescue team is on standby for emergencies. The mine maps are not up to date. This mine runs on exhaust ventilation system. The fan is not running , but it can be turned on and off at your request , but it can not be reversed. All power to the affected area has been disconnected in the mine.

2 Problem (Written Instructions)
Explore the mine necessary for accounting of the missing miners and bringing survivors to fresh air base The mine fan can be turned on and off to exhaust at your request. You have 60(sixty) minutes to complete the problem.

3 Field set up B D D B B D D R I D X X X X X X X X X X D XXXXXX Roofed
Over knee deep Hip knee 5.2% CH4 4 ppm CO 15.5% O2 X Lunch pail 5.2% CH4 4 ppm CO 15.5% O2 Unconscious live person 5.2% CH4 4 ppm CO 15.5% O2 B closed D D 5.2% CH4 4 ppm CO 13.5% O2 closed BC LC 2.0% CH4 6 ppm CO 15.2% O2 B Conscious live person B 2.0% CH4 6 ppm CO 15.2% O2 5.2% CH4 4 ppm CO 15.5% O2 X Battery scoop open Battery mine phone 3 timbers D X X D R I D D RA X Battery scoop open open 2.0% CH4 6 ppm CO 15.2% O2 BC X Person 1.0% CH4 6ppm CO 15.2% O2 X 50 ft. suction line 0.0% CH4 0 ppm CO 19.5% O2 Air tight XXXXXX 5.2% CH4 4 ppm CO 15.5% O2 X Rock drill X 1.2% CH4 7ppm CO 15.5% O2 Lunch pail BC Water trap The Command Center and Clock is on the surface Field set up X

4 Gas extents B D D B B D D R I D X X X X X X X X X X D XXXXXX
Irrespirable & Explosive mixture Explosive mixture Irrespirable Roofed Over knee deep Hip knee 5.2% CH4 4 ppm CO 15.5% O2 X Lunch pail 5.2% CH4 4 ppm CO 15.5% O2 Unconscious live person 5.2% CH4 4 ppm CO 15.5% O2 B closed D D 5.2% CH4 4 ppm CO 13.5% O2 closed BC LC 2.0% CH4 6 ppm CO 15.2% O2 B Conscious live person B 5.2% CH4 4 ppm CO 15.5% O2 open X 2.0% CH4 6 ppm CO 15.2% O2 Battery scoop Battery mine phone 3 timbers D X X D R I D D open RA X Battery scoop open 2.0% CH4 6 ppm CO 15.2% O2 BC X Person 1.0% CH4 6ppm CO 15.2% O2 X 50 ft. suction line 0.0% CH4 0 ppm CO 19.5% O2 Air tight XXXXXX 5.2% CH4 4 ppm CO 15.5% O2 X Rock drill X 1.2% CH4 7ppm CO 15.5% O2 Lunch pail BC Water trap The Command Center and Clock is on the surface Gas extents X

5 Team stops B 8/9 8/9 D D 7 B B D 6 5 1 D R I D 4 3 2 X X X X X X X X X
Roofed Over knee deep Hip knee 5.2% CH4 4 ppm CO 15.5% O2 build X Lunch pail 5.2% CH4 4 ppm CO 15.5% O2 Unconscious live person 5.2% CH4 4 ppm CO 15.5% O2 B 8/9 8/9 closed D D 5.2% CH4 4 ppm CO 13.5% O2 closed 7 BC LC 2.0% CH4 6 ppm CO 15.2% O2 B build Conscious live person B X 2.0% CH4 6 ppm CO 15.2% O2 5.2% CH4 4 ppm CO 15.5% O2 Battery scoop open Battery mine phone 3 timbers D X X 6 5 1 build D R I D D RA X Battery scoop open open 2.0% CH4 6 ppm CO 15.2% O2 BC X Person/body 1.0% CH4 6ppm CO 15.2% O2 X 50 ft. suction line 0.0% CH4 0 ppm CO 19.5% O2 Air tight XXXXXX 5.2% CH4 4 ppm CO 15.5% O2 X Rock drill 4 3 X 2 1.2% CH4 7ppm CO 15.5% O2 Lunch pail BC Water trap The Command Center and Clock is on the surface Team stops X

6 Vent # 1 B D D B B D D R I D X X X X X X X X X X D XXXXXX Roofed
Over knee deep Hip knee 5.2% CH4 4 ppm CO 15.5% O2 build X Lunch pail 5.2% CH4 4 ppm CO 15.5% O2 Unconscious live person 5.2% CH4 4 ppm CO 15.5% O2 B 5.2% CH4 4 ppm CO 13.5% O2 closed D D closed build open BC LC 2.0% CH4 6 ppm CO 15.2% O2 B Conscious live person Remove to outside B move 2.0% CH4 6 ppm CO 15.2% O2 5.2% CH4 4 ppm CO 15.5% O2 Battery scoop open X Battery mine phone 3 timbers D clear clear X X D R I D D RA X Battery scoop open open closed 2.0% CH4 6 ppm CO 15.2% O2 BC X Person 1.0% CH4 6ppm CO 15.2% O2 clear X 50 ft. suction line 0.0% CH4 0 ppm CO 19.5% O2 clear Air tight XXXXXX 5.2% CH4 4 ppm CO 15.5% O2 clear X Rock drill X clear 1.2% CH4 7ppm CO 15.5% O2 Lunch pail clear BC Water trap The Command Center and Clock is on the surface Vent # 1 X

7 Vent # 2 B D D B D D R I D X X X X X X X X X D XXXXXX Roofed
Over knee deep Hip knee 5.2% CH4 4 ppm CO 15.5% O2 build X Lunch pail 5.2% CH4 4 ppm CO 15.5% O2 Unconscious live person 5.2% CH4 4 ppm CO 15.5% O2 build B D D 5.2% CH4 4 ppm CO 13.5% O2 closed closed open clear BC LC 2.0% CH4 6 ppm CO 15.2% O2 B clear remove move Battery scoop open X Battery mine phone 3 timbers D X D R I D D RA X Battery scoop open open closed BC X Person X 50 ft. suction line build Air tight XXXXXX X Rock drill X 1.2% CH4 7ppm CO 15.5% O2 Lunch pail BC Water trap The Command Center and Clock is on the surface Vent # 2 X

8 Final step B D D D D R I D X X X X X X X X X X D XXXXXX Roofed
Over knee deep Hip knee 5.2% CH4 4 ppm CO 15.5% O2 build X Lunch pail 5.2% CH4 4 ppm CO 15.5% O2 Evacuate mine FPA Unconscious live person 5.2% CH4 4 ppm CO 15.5% O2 Remove to outside build B Enter barricade D D closed closed open build BC Note: maintain airlock integrity LC build X move Battery scoop open Battery mine phone 3 timbers D X X D R I D D RA X Battery scoop open open closed BC X Person X 50 ft. suction line Air tight XXXXXX X Rock drill X 1.2% CH4 7ppm CO 15.5% O2 Lunch pail BC Water trap The Command Center and Clock is on the surface Final step X

9 Final Ventilation D D D D R I D Team:_________________________
Inititals:_________________________ D D D D R I D Final Ventilation

10 Final Ventilation D D D D R I D Team:_________________________
Inititals:_________________________ D D D D R I D Final Ventilation

11 Team:_________________________
D D D D R I D Judging map

12 Team:_________________________
D D D D R I D Judging map

13 Team:_________________________
D D D D R I D Judging map


Download ppt "Fresh Air Base Statement"

Similar presentations


Ads by Google