Presentation is loading. Please wait.

Presentation is loading. Please wait.

E.H. Pechan & Associates, Inc.

Similar presentations


Presentation on theme: "E.H. Pechan & Associates, Inc."— Presentation transcript:

1 E.H. Pechan & Associates, Inc.
Western Regional Air Partnership Emissions Database Management System CERR Workshop San Francisco May E.H. Pechan & Associates, Inc.

2 Project Design and Status

3 Organization

4 Software/Hardware Development Plan
Organization Purpose Scope Schedule Communications Software/Hardware Development Plan

5 Purpose

6 Region-Wide Emission Inventory Analysis of Collected Data
Purpose Regional Haze Rule Implementation Performance Monitoring Region-Wide Emission Inventory Analysis of Collected Data Emissions Comparisons Emissions Trends Analysis

7 Scope

8 Database Organization Web-Based Analysis Interface Batch Data Take On
Scope Database Organization Web-Based Analysis Interface Batch Data Take On Outputs/Data Extracts Administrative Module/DBA Functions

9 Database Organization All Sectors Multiple Years Multiple Types
Scope Database Organization All Sectors Multiple Years Multiple Types Data Versioning

10 Web-Based Analysis Interface Public
Scope Web-Based Analysis Interface Public GIS Query/View of Locked Data Preformatted Reports Preformatted Data Extracts Secure GIS Query/View of Working Data Ad-hoc Reports/Extracts Data Import/Export

11 QA/QC Procedures (QAPP)
Scope Batch Data Take On NIF Version 3.0 WRAP EDMS Format TEISS QA/QC Procedures (QAPP) Recursive QA/QC Gap-Filling/Data Adjusting

12 Scope Outputs/Data Extracts NIF Version 3.0 SMOKE IDA Ad-Hoc Tables/Summaries

13 Administrative Module/DBA Functions User Management/Security LISTSERV
Scope Administrative Module/DBA Functions User Management/Security LISTSERV Ad-Hoc Functions QA/QC Report Development Analysis

14 Multiple Deliverables One Year Timeline
Scope Project Attributes Nine Tasks Multiple Deliverables One Year Timeline

15 Scope/Project Flow Systems Analysis and Design QA/QC Processes Reports
Hardware - Home Location Routine Operations Training Build and Document Maintenance and Support Test and Refine Initial Data Load

16 Schedule

17

18

19

20 Communications

21

22 Software and Hardware Development Plan

23 Software and Hardware Development Plan
Introduction Data Requirements Functional Requirements Hardware Development Plan Implementation Plan Administration

24 SWHWDP – I. Introduction
System Requirements Pollutants

25 SWHWDP – II. Data Requirements
Conceptual Model

26 SWHWDP – II. Data Requirements
Sources

27 SWHWDP – II. Data Requirements
Biogenic/Dust Overrides

28 SWHWDP – II. Data Requirements
Point, Area, On-Road Mobile, Non-road Mobile: Covered by NIF submittal

29 SWHWDP – II. Data Requirements
Fire Five Fire types Emissions Calculated in EDMS EDMS-specific reporting format Episodic data Geographic data

30 SWHWDP – II. Data Requirements
NAR/County Emissions Accounting Two overlap types EDMS Method to report type Default handling Accommodate EPA’s modifications to NIF

31 SWHWDP – II. Data Requirements
Data Versions

32 SWHWDP – II. Data Requirements
QC – Edits Consistent with NIF Tracking of EDMS-specific EDITS QA – Five-step process Generate QA Plan Overview ID and Define Methods Develop Strawperson for gap-filling Define data access and operational management Develop Phase II project list

33 SWHWDP – III. Functional Requirements
Architectural Overview

34 SWHWDP – III. Functional Requirements
Import Now Access Text Soon XML CDX

35 SWHWDP – III. Functional Requirements
Interface

36 SWHWDP – III. Functional Requirements
GIS Interface

37 SWHWDP – III. Functional Requirements
Fire Calculation

38 SWHWDP – III. Functional Requirements
Reporting Standard Reports Summary Top 10 CAC Pre-trigger SO2 Ad-Hoc Reports

39 SWHWDP – III. Functional Requirements
Exporting Query/Report-Based Model-Ready Special Analysis RPO Data Exchange Format

40 SWHWDP – III. Functional Requirements
Security Login-based Public/Data Provider Special Access DBA User’s Manual

41 SWHWDP – IV. Hardware Requirements
Sizing 18 GB? Bandwidth MB/day vs. GB/day Processing Oracle Server has 64 CPUs and 64GB of RAM Back-Up Recovery, Physical Security “Best Practices” organization

42 SWHWDP – V. Implementation Plan
Test Plan – Functional Accuracy and Usability Testing Levels Program, function, subsystem, system Testing Categories Objective, Stress, Volume, etc. Specification of Elements Purpose, Environment, Assumptions, etc. Economy

43 SWHWDP – V. Implementation Plan
Training Lecture + Hands-on Specific to User-class Data Providers, Planners, Viewers Covers Feature Set Login, Submission, Analysis, Reporting

44 SWHWDP – V. Implementation Plan
Maintenance Support Web-based Telephone

45 SWHWDP – V. Implementation Plan
Data Take-on July 1, 2004 Acceptance Testing Strategy Three-month review Critical Success Factors Oversight DBA, DA EDMS Oversight Committee

46 SWHWDP – VI. Administration, Appendices
Progress Reports A - Data Dictionary and Validations B – Fire White Paper C – Standard Report Layouts D – Sample Use Cases E – Sample Features F – Phase II Concepts G – EDMS Input H – NIF / IDA Data Translation I – RMC Biogenic Mapping J – RPOX Mapping Strategy

47 End of Presentation


Download ppt "E.H. Pechan & Associates, Inc."

Similar presentations


Ads by Google