Preventive Maintenance Team Jerry Geib Research Operations Engineer
2019 Pavement Workshop May 22, 2019 Preventive Maintenance Team Jerry Geib Research Operations Engineer 55 Associate Members
2
Preventive Maintenance Team
Web Page, google NRRA Members Long term research Short term synthesis VISIT the web page
3
Preventive Maintenance Team
Members Member List the team General Questions Jerry Geib - Chair Minnesota DOT 10-15 minutes before our monthly meeting, visit the web page. Check last meeting minutes. Communication is the key, to close the distance between us. Use the contacts.
4
Preventive Maintenance Team
DOT Members Mark Gawedzinski--Illinois Department of Transportation Jerry Geib (Chair)--Minnesota Department of Transportation Ned Grady--Wisconsin Department of Transportation Robert Green -- Michigan Department of Transportation Pete Kemp--Wisconsin Department of Transportation Elliot Keyes--Minnesota Department of Transportation Jeffery Kroner--Missouri Department of Transportation Leo Mahserelli-- Caltrans – California Department of Transportation Doug Mason-- Caltrans – California Department of Transportation Jesse Nelson, North Dakota Department of Transportation Phil Ruffus--Missouri Department of Transportation Mike Shea --Missouri Department of Transportation Stephanie Weigel, North Dakota Department of Transportation Put the faces with the names. Iowa is our newest member, tbd
5
Preventive Maintenance Team
Associate Members Robert Betsold--All States Material Group Brandon Brever --Minnesota Asphalt Pavement Association (MAPA) Rod Birdsall--All States Material Group John Brunkhorst--Minnesota Local Road Research Board - McLeod County Eshan Dave--University of New Hampshire Jolee Dominowski--Dow Chemical Tyler Eckenrode--Flint Hills Resources Andrew Hanz--Mathy Construction Buzz Powell--National Center for Asphalt Technology (NCAT) John Roberts--International Grooving and Grinding Association Timo Saarenketo--Roadscanners, USA Tom Wood--WSB & Associates, Inc Dan Wegman--Braun Intertec Matt Zeller--Concrete Paving Association Industry is Involved – should always be involved Hang out with smart people Learn new things White down questions on a post it, get answers.
6
Preventive Maintenance Team
Friends and Support Members Jason Blomberg--Missouri Department of Transportation Melissa Cole--Minnesota Department of Transportation Ron Jones, Caltrans Eddie Johnson--Minnesota Department of Transportation Kevin Kliethermes--FHWA Joe Korzilius, SRF Consulting Renae Kuehl, SRF Consulting Matt Mastel, North Dakota Department of Transportation Aaron Perez, North Dakota Department of Transportation John Senger--Illinois Department of Transportation Ben Worel--Minnesota Department of Transportation Tom Zimmerman--Minnesota Department of Transportation
7
Preventive Maintenance Team
Long term research Maintaining Poor Pavements, Phase 1 Project Summary: The objective of this project is to identify performance improvements that can be expected for Hot-Mix Asphalt (HMA) roadways, from the application of a variety of thin pavement rehabilitation treatments similar to and including thin lift overlays, fine graded HMA scratch course with a chip seal, mastic surface correction for cupped cracks with a chip seal, microsurfacing, scrub seals, etc. From the Preventive Maintenance , home page, click on links to all the project web pages.
8
Preventive Maintenance Team
Long term research Maintaining Poor Pavements Task 2: Collect data from the NRRA States Key task for this project to be successful.
9
Preventive Maintenance Team
Long term research Effective Long Lasting Partial Depth Joint Repairs for Challenging Conditions, Phase 1 Project Summary: As Portland Cement Concrete (PCC) pavements age, longitudinal and transverse joints can exhibit signs of distress as a result of traffic loading, climatic variations, materials related issues, and construction defects. Although only small areas are often involved, the joint distress can substantially disrupt traffic flow and increase pavement roughness sacrificing consumer ride comfort. Furthermore, secondary distresses and degradation of otherwise sound concrete can occur due to poor joint conditions.
10
Preventive Maintenance Team
Long term research Effective Long Lasting Partial Depth Joint Repairs for Challenging Conditions Task 1: Summary of the Patch installation Task 2: Survey and Literature Review Task 3: Annual Condition Review and Interim Report
11
Preventive Maintenance Team
Short term synthesis Surface characteristics of diamond ground PCC surfaces Task 1: Identify Textures for Evaluation: Identify test cells at MnROAD and test sections within the MnDOT PMS system that can be used as candidate sections for evaluation.
12
Preventive Maintenance Team
Short term synthesis Technical Advisory Panel (TAP) Robert Green (MI) Maria Masten (MN) John Roberts (IGGA) Matt Zeller (CPAM) Zhanping You (MTU) Jim Wilde (MSU) me if you would like to join the panel.
13
Preventive Maintenance Team
Short term synthesis Pavement preservation approaches for lightly surfaced roads Options for local agencies to preserve roads that meet the unique requirements of low volume roadways. Address roadways surfaced with aggregates, thin PCC, stabilized RAP, including both engineered emulsion and foamed asphalt. Needs to be better scoped by the PM team.
14
Preventive Maintenance Team
Short term synthesis, TAP Mark Gawedzinski (IL) Andrew Hanz (MTE Services) Kevin Kliethermes (FHWA) Dan Wegman (Braun) Zhanping You (MTU) Eshan Dave (UNH) Jim Wilde (MSU) Ed Johnson (MN) Jerry Geib (MN) Ask for volunteers.
15
Preventive Maintenance Team
PHASE II Spray on Rejuvenator SYNTHESIS Project Summary: A synthesis on field projects constructed to evaluate spray on rejuvenators, by NRRA members, NCAT, NCHRP, MN cities and counties, and others. Also include all recent research projects by MO DOT with ARA. The final report should read as a work plan for the rejuvenator test sections. Include products to tests, tests to run, frequencies, etc.
16
Preventive Maintenance Team
Long term research PHASE II Spray on Rejuvenator Test Sections Project Summary: A very detailed study of spray applied rejuvenators on a newer HMA pavement. Testing will include friction, pavement marking reflectivity, and other tests (tbd) to study the effect of the products. This is expected to require a significant amount of hours. Traffic control and testing will be the responsibility of the research team. The research team will plan and coordinate all aspects of the product installation. Due to the number of products that may be included and the desire to apply them to newer pavements, this study will likely not be at MnROAD. 500’ sections are desired.
17
Preventive Maintenance Team
PHASE II Service Life Enhancement of Substrates Overlaid with Thin Overlays (UTWBC, Chip Seals & Microsurfacing) for each state STUDY Project Summary: Whereas the use of thin overlays as preventive maintenance and other strategies have intensified in recent years, very little about the life-extensions that these fixes impart on their various substrates have been tenably quantified. Additionally, variability in life-extensions with respect to the design and condition of various substrates as well as timing of their intervention also need to be determined. In an investment scenario, agencies need to know what enhancements in service lives and changes in failure-modes (if any) are derivable from these fixes to improve informed institutional decision process pertaining to their usage. This small scale analytic project should not exceed 3 months and an estimated cost of $20,000 since raw data is already available.
18
Questions or Comments?