Presentation is loading. Please wait.

Presentation is loading. Please wait.

IEEE ESS Mesh Study Group

Similar presentations


Presentation on theme: "IEEE ESS Mesh Study Group"— Presentation transcript:

1 IEEE 802.11 ESS Mesh Study Group
Month 2002 doc.: IEEE /xxxr0 May 2004 IEEE ESS Mesh Study Group Garden Grove, California 11-13 May 2004 Donald E. Eastlake 3rd Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

2 Tuesday Evening 11 May 2004, Grand F+G, 7:30pm-9:30pm
Month 2002 doc.: IEEE /xxxr0 May 2004 Tuesday Evening 11 May 2004, Grand F+G, 7:30pm-9:30pm Call to Order Review IEEE 802 and Policies and Procedures Intellectual Property Voting All Registered Meeting Attendees May Vote All Main Motions require 75% Attendance Study Group Attendance List On-line Attendance reminder Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

3 IEEE-SA Standards Board Bylaws on Patents in Standards
Month 2002 doc.: IEEE /xxxr0 May 2004 IEEE-SA Standards Board Bylaws on Patents in Standards 6. Patents IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. Approved by IEEE-SA Standards Board – December 2002 Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

4 Inappropriate Topics for IEEE WG Meetings
Month 2002 doc.: IEEE /xxxr0 May 2004 Inappropriate Topics for IEEE WG Meetings Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE Patent Committee Administrator at Approved by IEEE-SA Standards Board – December 2002 Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

5 Tuesday Evening (cont.) 11 May 2004, Grand F+G, 7:30pm-9:30pm
Month 2002 doc.: IEEE /xxxr0 May 2004 Tuesday Evening (cont.) 11 May 2004, Grand F+G, 7:30pm-9:30pm Officers & Minutes Approval of Minutes of Previous Meeting, 11-04/395r2 Approval of the Minutes of the Informal Teleconference held April 21st, 11-04/465r1 Note: Study Group Secretary: Tyan-Shu Jou, Janusys Networks Study Group Technical Editor: W. Steven Conner, Intel Task Group Secretary and Technical Editor will be chosen at first Task Group Meeting. “Free the APs” Button Graphics: 11-04/518r0. Approval of Agenda (a list of proposed presentations will be given so the group can order them) Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

6 Tuesday Evening (cont.) 11 May 2004, Grand F+G, 7:30pm-9:30pm
Month 2002 doc.: IEEE /xxxr0 May 2004 Tuesday Evening (cont.) 11 May 2004, Grand F+G, 7:30pm-9:30pm Report on the Status of the PAR and 5 Criteria Abbreviations were expanded at the request of a NesCom member. A NesCom member queried as to whether this overlapped any ITU or IEC standards effort. It appears that it does not. Presentations: Adjourn until Wednesday at 8am Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

7 Month 2002 doc.: IEEE /xxxr0 May 2004 Wednesday, 12 May 2004, Grand F+G, 8am-10am, 1:30pm-3:30pm, 4:00pm-6:00pm On-line attendance reminder Presentations: Recess until 1:30pm Recess until 4pm Study Group Process, Part 1: How should we proceed toward a draft? Adjourn until 8am Thursday Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

8 Month 2002 doc.: IEEE /xxxr0 May 2004 Thursday, 13 May 2004, Grand F+G, 8am-10am, 10:30am-12:30pm, 1:30pm-3:30pm On-line attendance reminder Presentations: Recess until 10:30am Study Group Process, Part 2: How should we proceed toward a draft? Recess until 1:30pm Next Meeting / Teleconference Last teleconference was convenient for the USA (noon eastern US time). Adjourn sine die Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

9 [Reference Information]
May 2004 [Reference Information] PAR & 5 Criteria 04/54r2, Draft PAR for IEEE ESS Mesh 04/56r1, Five Criteria for IEEE ESS Mesh Study Group Meeting Minutes March 2004, Lake Buena Vista, Florida, 04/395r2 January 2004, Vancouver, British Columbia, 04/110r2 Teleconference Minutes April 21st, 11-04/465r1 Earlier Mesh Submissions to WNG Study Group, see r0 Donald Eastlake 3rd, Motorola Laboratories


Download ppt "IEEE ESS Mesh Study Group"

Similar presentations


Ads by Google