1 HYUNDAI ELECTRICAL ELECTRONIC SYSTEM CO.,LTD
HEESCO HYUNDAI ELECTRICAL ELECTRONIC SYSTEM CO.,LTD

2 1 2 Company Overview Manufacturing Condition Introduction of company
Company Outline History Organization Chart Factory Main Device Main customer Annual Total Sales Completed Major Project Certificate of Inscription 2 Manufacturing Condition Process Overview Manufacturing Process Type Test Certificate Condition of Personal Experiences

3 CHAPTER 1 Company Overview

4 Introduction of Company
We are aiming to be a global leading company with the highest quality and diversified items for customers in developing new markets, trusted enterprises, quality system, management innovation. HEESCO was established in 1997 and has grown steadily to become one of leading, and highly respected Switchgear manufacturer based on advanced technology and outstanding quality competitiveness. In the era of rapidly changing industrial environment and technological innovation, we are aware that a new product development is the foundation of the survival strategies and succeeded in the development of Metal Clad Switchgear, 732KV, 3000A, 40KA / 1200A, 1200A, 40KA which includes new upgraded technologies. Thanks to the success of the development of the switchgear, we secured the capability to supply the high version switchgears to Korea Electric Power Corporation, which requires a high degree of reliability. This Metal Clade Switchgear, which has been tested successfully at KERI (Korea Electrotechnology Research Institute) , has s a significant reduction in the width of panel which is a unique technology in domestic market, it could be installed in very limited space and suitable for revamping project. We will continuously strive to develop new technologies and new products, and to lead the new industry in the 21st century.

5 Company Outline Name of Company HEESCO Name of Representative
Park Jin Ok Business License No Corporate Registration No Date of Corporate Incorporation APR 1 ,1997 Date of Incorporation DEC 1, 2001 Address 1352, Samdong-ro, Samdong-myeon, Ulju-gun, Ulsan, Republic of Korea Phone No(FAX) ( ) Website Number of Employees 228

6 History 1997 Established of HEESCO 1999 Selected as sub-contractor of HHI 2001 Changed HEESCO Co..Ltd. 2002 New Plant Shop No.15-1, Bangeo-dong, Dong-gu, Ulsan, Korea 2004 Selected as a sales agency for sale and after-sales services of HHI KSA 9001:2001(ISO 9001:2000) Acquiring Certificate(WSCS) Registered as the supplier of Korea Midland Power Co., Ltd Registered as the supplier of Public Procurement Service 7.2KV 40KV Metal Clad Switch Gear KERI certified 2005 Incheon Thermal Power Plant (Jungbu Power Plant) 6KV MCSG Delivery Registered as the supplier of Korea Western Power Co., Ltd Seocheon Thermal Power (Jungbu Power Plant) 7.2KV 40KA VCB Modification / Delivery Registration for Qualified suppliers of Korea South Eastern Power Generation 2006 San Cheong (East-West power generation)24KV VCB Delivery / Installation 2007 Dangjin Thermal Power (East-West power generation) ACB Remodeling / Delivery / Installation

7 History 2008 Registered as the specialized company in Retrofit, Kepco Registered as the supplier of Korea East-West Power Co., Ltd Ilsan Combined Power Industry (East-West power generation) 7.2KV 40KA VCB Remodeling / Delivery / Installation Donghae Thermal Power Plant (East-West power generation) 7.2KV 40KA VCB Delivery (Voluntary Contract) Registered as a Venture Company (Evaluation Facility: Technology Assurance Fund) Ulsan Thermal Power Plant (East-West power generation) 480V 40KA ACB Remodeling / Delivery / Installation Samrangjin (Western Power Plant)7.2KV 40KA VCB Remodeling / Delivery / Installation Headquarter Relocated to , Jakdong-ri, Samdong-myeon, Ulju-gun, Ulsan, Korea Taean Thermal Power Plant (Western Power Plant) 480V 40KA ACB Remodeling / Delivery / Installation 2009 San Cheong (East-West power generation) 7.2KV 40KA VCB Remodeling / Delivery / Installation Taean Thermal Power Plant (Western Power Plant) 7.2KV 40KA VCB Precision inspection / Repair Donghae Thermal Power Plant (East-West power generation) 7.2KV 40KA VCB Precision inspection Pyeongtaek Combined Thermal Power (Western Power Generation) 7.2KV 40KA VCB Remodeling / Delivery / Installation Taean Thermal Power Plant (Western Power Plant) 7.2KV 40KA Delivery / Installation

8 History 2009 Seocheon Thermal Power (Central Power Generation) 7.2KV 40KA VCB Remodeling / Delivery / Installation Korea Regional Heating Corporation (Goyang)7.2KV 40KA VCB Remodeling / Delivery / Installation Registration for Qualified suppliers of Korea South Eastern Power Generation 2010 Location registration in , Yeocheon-dong, Nam-gu, Ulsan, Korea 2011 Acquisition of certification of innovative SMEs 2012 Vacuum circuit breaker 3POSITION Patent registration of outlet device 2015 Succeeded in developing remote automatic withdrawal port device of circuit breaker 2016 Patent application of position guidance device switchboard attachment device Registered as Breaker Agency of Hyundai-Electric South Korea South East Power Generation Equipment Supply Certificate Registration 2017 Registered as a cooperating company of Hyosung Heavy Industries

9 Welding (Internal partner)
Organization Chart Sales Estimate (Total Employees : 228) President Sales Section Sales Team On-site sales Electrical Design Structure Design Team Design Section CNC Program Vice President Program Team Mechanical Process section Electric Field Production Team Laser Bending Machine CNC Welding (Internal partner) Production Section Production Team Complete Assembly PINBOARD Breaker Internal partner Door MT’G 1 MT’G 2 MCC 1 MCC 2 Quality Section Quality Team Switchboard Breaker Management Section Management Team Process Control General Affairs Purchasing Material Delivery A/S

10 <Bending Machine>
Factory Main Device <CNC> <Bending Machine> <Laser> <Welding Equipment>

11 [High Voltage Control Device]
Factory Main Device Puncture Tester [High Voltage Control Device] 3PH AC/DC POWER SUPPLY PUNCTURE TESTER Mega ohm tester [Digital MΩ HiTester]

12 Main customer

13 Annual Total Sales

14 Year PJT NAME ITEM QUANTITY Completed Major Project 2012
UAE BOROUGE #3 11KV SWGR / 3.3KV SWGR 193 TRUKMENISTAN PJT 400V LV SWGR / MCC 129 TOYOTA/MOE SP03/04 PROJECT 214 2013 IRAQ WEST QURNA FIELD DEVELOPM LV MCC 227 2014 JEDDAH SOUTH THERMAL POWER PLANT 13.8KV SWGR / 480V LV SWGR / MCC 542 AZ-ZOUR NORTH IWPP PROJ 11KV SWGR 179 URUGUAY UTE PUNTA CCPP 480V MCC 160 2015 SHUQAIQ STEAM POWER PLANT LV DIST 379 2016 IRAQ ZUBAIR DGS PACKAGE 400 SWGR / MCC 263 KNPC CFP MAB #2

15 Certificate of Inscription

16 CHAPTER 2 Manufacturing Condition

17 Head Office Process Overview Enclosure Production Enclosure Assembly
Busbar Assembly Electric Operating Test Insulation Test Breaker & Material Operation Test Package & Delivery

18 Branch Process Overview Mounting Material Production
Door Material Production MCC UNIT Production Wiring Process Wiring Check

19 Head Office Branch Cross section “B” Process Overview
A- Drawout Circuit Breaker & Optional Items C- Mainbus & Fixed Type of Separation D- CT & Earthing Switch / Branch Line / Epoxy Insulator / Cable Clamper Branch B- Relay, Meter, Remaining Control & Electrical Material for Operating Circuits Cross section “B”

20 Ordering Organization (Customer)
Manufacturing Process Ordering Organization (Customer) PJT Order Quote Project Generalization Cost Analysis Sales Section Approval Drawing Material Specification Production Drawing Final Drawing Design Section Order Material Warehousing inspection Stock Control Material Section MCC UNIT Production DOOR Production Plate Production Circuit Wiring Enclosure Assembly Busbar Attachment Electrical Material Attachment Pin board Completion On-site Inspection Wiring Test Operating Test Visual Test Quality Section

21 Type Test Certificate

22 Department Personal Experiences
Condition of Personal Experiences Department Total Personal Experiences More Than 10 Years 5 to 9 Years 2 to 4 Years Less Than 1 Year Design Section Electric 7 3 2 Structure 8 6 Production Section Enclosure 16 4 5 Wiring 90 21 42 Assembly 71 9 35 23 Quality Section 12 Sales Section 1 Management Section 18 TOTAL 228 58 92 62