FY 2019 CIP Budget Comparison
Agency No. of Connections Pipes/Tanks/Pump Stations % of Local Supply FY 2019 CIP Budget ($M) MMWD 61,000 900/128/97 79% $20 Santa Rosa 53,000 600/24/20 10% $13 DSRSD 24,000 280/14/17 0% $16 Santa Cruz 25,000 300/16/18 100% $32 Alameda CWD 83,000 900/13/14 40% $32.6 EBMUD 389,000 4,100/168/140 $367
3
Water Agency Rate Comparison
Bimonthly Cost of Water for Single Family Residential Customers (5/8" meter and 17ccf) Note: Fire Flow program not included.
4
Tier 1 Rate History
5
Budget Overview FY20 overall budget totals $105.2 million
Since FY2010 staffing numbers have been reduced from 266 to 240
6
Rate Proposal Overview
MMWD is proposing to raise water rates to: invest in our aging infrastructure responsibly manage the growing demands on the watershed, including wildfire mitigation and protection continue to deliver high quality water – 24/7/365 The proposed rate changes include two main components, effective 7/01/2019: An increase to the water use (tiered rates) and fixed charges averaging a 4% revenue increase to keep pace with increasing costs to fund MMWD’s ongoing operations and maintenance needs. A new Capital Maintenance Fee (CMF) to fund ongoing investments in critical water system projects and projects to reduce wildfire risk on Mt. Tam.
7
Capital Maintenance Fee (including fire & fuels management)
5/8” meters make up 69% of all accounts and 74% of all single family residential accounts
8
Impact to Average Customer
9
Updates to Rate Proposal
Service Charge Waiver Program for low income residents Super Water Saver program Addressing meters upsized for non-consumption reasons CMF collection method
10
Four Water Supply Sources (FY 17-18)
Conservation Conservation preserves our water supply and means we don’t have to invest in costly new supplies. District sources are high quality, local water. Because of conservation, we are using about 30% less water today than we did 30 years ago (35,000 AF in 1988 compared to 25,000 AF in 2019).
11
Your Water System 7 Reservoirs Recycled Water Mt. Tam Rainfall
2 Treatment Plants Mt. Tam Rainfall Russian River 77% Habitat (12,925 AF/yr) Recycled Water (600 AF/yr) 900 miles layed end to end will nearly get you to Yellowstone National Park from San Rafael, CA. Water from Nicasio to San Rafael travels about 15 miles. If you live in SF, water has to travel about 300 miles to get to you storage tanks does not include 10 hydropneumatic storage tanks which do not provide storage. Each year we invest $20M in capital improvements to maintain the reliability of our water system. 21% 22,800 AF/yr 190,000 residents 128 Storage Tanks, 97 Pump Stations 900 miles pipelines
12
What Have We Accomplished?
In the last 10 years, we’ve invested over $200M in the maintenance of district infrastructure: Replaced 34 deficient storage tanks Recoated 10 storage tanks preserving 7 million gallons of storage Replaced 74 miles of deficient pipe Seismically upgraded filters at San Geronimo and Bon Tempe Water Treatment Plants 74 miles for Elysha’s pipe summary spreadsheet. Total tanks = 138 (34 out of 138 = 25%),
13
What Have We Accomplished?
Transition – moving from what we’ve done to the impact of what we’ve done, D17011, 6,700 feet of 80 year old pipe, ahead of Larkspur and CM paving, budget at $2m, photo shows pipe being installed in Elm Avenue, which replaced 6” and 4” CI from Benefit of this program is 50% reduction in water main breaks (from almost 300 per year down to about 150 per year), less disruption to the community and water loss. Elm Ave Pipeline Replacement Project (2017), replacement of 6,700 feet of 80-year old pipe prior to town paving projects in Larkspur and Corte Madera
14
Infrastructure Investments Have…
Improved seismic reliability of treatment plants Invested $9M to fix filters at San Geronimo and Bon Tempe Water Treatment Plants Filters being seismically upgraded at San Geronimo Treatment Plant (2017)
15
Infrastructure Investments Have…
Improved water system’s fire fighting capability: Replaced 39 miles of fire flow deficient water main pipe Increased flow capacity at 400 fire hydrants Redwood Tank Program: replaced 31 redwood storage tanks with bolted steel tanks Improved water quality Reduced earthquake vulnerability Reduced fire risk Transition – That sounds like a lot, and it is. You might ask yourself, is there more to do? The answer is a resounding yes. And let me show you why.
16
MMWD’s Aging Facilities
Facility Total Number Number with Years in Service >50 years > 75 years Treatment Plants 3 2 (66%) Storage Tanks 128 55 (43%) 11 (9%) Pipelines (miles) 900 439 (49%) 76 (8%) Reservoirs 7 5 (70%) 3 (43%) As the oldest municipal water district in California, we have a rich history. That also means our infrastructure is very old. 1) plants, 2) storage tanks, 3) pipelines 14 miles of pipe > 100 years old, transition to next slide about CI pipe.
17
Our Aging Facilities – Pipelines
300+ miles of problematic cast iron pipe remain in system Cost to replace 1 mile of pipe = $1.5M (in today’s dollars) 6/10/18, 212,000 gallons, 8-inch cast iron main, 1953 (65 years old), fine = $285,000, repair = $37,000; annual water main repair rate has dropped 50% in last 20 years from 282 to 150 Ask how many water main repairs do we make per year? Answer: It used to be a lot higher, nearly double that. Leak on 65 year old cast iron pipe in Fairfax (June 10th)
18
10-Year Capital Improvement Plan
Total = $232M Transition slide – now let’s talk about what we are doing for the next 10 years; emphasize that source for CIP is CMF Distribution System includes: cathodic protection, pipeline replacement, fire flow, reservoir/dam facilities, buildings and grounds, pumps and pump stations, meter replacements, energy recovery and enhancement, drought resiliency.
19
Maintain Treatment Plants ($20M)
10-Year Capital Improvement Plan Maintain Treatment Plants ($20M) Upgrade Clarifiers to Withstand Earthquakes
20
Replace 50 miles of deficient pipes ($96M)
10-Year Capital Improvement Plan Replace 50 miles of deficient pipes ($96M) SFD PRP will replace 12-inch CI from Manor Road to Ross Terrace in coordination with the County’s SFD Road Rehabilitation Project Sir Francis Drake Pipeline Replacement Project will replace 5,300 feet of 100-year old cast iron pipe
21
Maintain Storage Facilities ($30M)
10-Year Capital Improvement Plan Maintain Storage Facilities ($30M) Replace 90-year old Ross Reservoir Tank ($16M) Ross Reservoir is a critical storage tank in the District’s Ross Valley Gravity System that supplies water to a population of 44,000 (23% of District’s customers). Tank is too small and falling apart – needs to be replaced. Smith Saddle Storage Tanks also provide critical storage, 5 mg each, 50% of water delivered flows through Smith Saddle, steel tanks are strong but need coating to prevent corrosion and maintain useful life. Introduce team at tables, transition to Crystal Rehabilitate 60-year old Smith Saddle Tanks ($7M)
22
Watershed Budget Increases
23
Watershed Wildfire Risk
Over 13,000 structures are within 1 mile of watershed and 25,000 structures within 2 miles. The Watershed is rated by the CPUC as a Tier 3 Fire Risk. The Watershed is also rated as High to Very High under CalFire’s Fire Hazard Severity Zones. Increased Fuel Loads - due to forest diseases (Sudden Oak Death), invasive plants, encroachment of Douglas fir, and fire suppression (last major fire Mill Fire ). Potential impacts to water supply infrastructure and water quality.
24
Fire Fuels Reduction
25
Approaches to Reducing Wildfire Risk
Maintenance and Construction of Fuel Breaks (1000 acres) primary, secondary, wide area, and defensible space. Emergency Access (100 miles) fire road clearance and road maintenance. Fire Response wildland fire-fighting capabilities, Type 3 engine and water tanker, and MERA. Vegetation Management resilient forest project, invasive species, prescribed burns, Douglas fir thinning and the Draft Biodiversity, Fire, and Fuels Integrated Plan (BFFIP). Agency Coordination Marin County Fire, Office of Emergency Services, PG&E, Conservation Corps North Bay, and FireSafe Marin. Fire flow program started in 1996, $75/yr parcel fee Replaced 39 miles of fire flow deficient water main pipe Increased flow capacity at 400 fire hydrants Redwood Tank Program: replaced 31 redwood storage tanks with bolted steel tanks