Download presentation
Presentation is loading. Please wait.
1
Report on 802.15 Date: 2016-07-29 Authors: July 2016 July 2013
January 2009September 2008 September 2008 doc.: IEEE /0924r0 July 2016 Report on Date: Authors: Clint Chaplin, Imagicon Clint Chaplin, Samsung Electronics
2
Abstract Report on 802.15 as presented to 802.11 September 2008
July 2013 January 2009September 2008 doc.: IEEE /0924r0 Abstract Report on as presented to Clint Chaplin, Samsung Electronics
3
Listening to preliminary proposals
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 d 100 Gb/s Listening to preliminary proposals Discussion of merging proposals to one final proposal Discussion on spectrum issues (Kick-off activities: PAR for 802.1AC amendment) Slide 3 Slide 3 Page 3 Page 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
4
802.15.3e High Rate Close Proximity (HRCP)
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 e High Rate Close Proximity (HRCP) Prepared Sponsor Ballot submission Agreed on BRC and call schedule Approved motion to request unconditional approval to start Sponsor Ballot. Slide 4 Slide 4 Page 4 Page 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
5
802.15.3m 802.15.3 Revision Published! September 2008
January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 m Revision Published! Slide 5 Slide 5 Page 5 Page 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
6
802.15.4s Spectrum Resources Usage
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 s Spectrum Resources Usage Review and edit Draft Document and generated D1.0. Going out for Initial Letter ballot and set up a BRC. Slide 6 Slide 6 Page 6 Page 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
7
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 t Higher Rate First initial WG letter ballot closed on June 23, Results were 62 yes, 4 no, 7 abstain % passes! 16 comments submitted: 9 technical, 7 editorial Resolved all comments, planning on recirculation LB after meeting. Asking the EC for conditional approval to start sponsor ballot Hoping to have sponsor ballot between now and September meeting. Slide 7 Slide 7 Page 7 Page 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
8
802.15.4u Support for India Bands
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 u Support for India Bands First Initial WG Letter Ballot closed April 17, Results: 66 yes, 5 no, 3 abstain % passed! 27 comments: 9 technical, 18 editorial All comments resolved. First recirculation WG ballot closed May 17, Results: 73 yes, 0 no, 3 abstain 5 comments, all editorial First sponsor ballot closed July 15, Results: 62 yes, 1 no, 1 abstain. 51 comments, 1 MBS All comments resolved, going out for recirculation Slide 8 Slide 8 Page 8 Page 8 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
9
802.15.4v Regional SUB 1GHz Bands
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 v Regional SUB 1GHz Bands New Group, Started in March Draft available, going out for initial WG ballot Slide 9 Slide 9 Page 9 Page 9 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
10
802.15.7r1 Optical Camera Communication
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 r1 Optical Camera Communication Finished Draft D0. Had an internal WG review on D0 Received 871 technical comments, 1568 editorial comments Resolving comments from internal review; resolved 325 technical comments so far. Changing project name to “Optical Wireless Communications” Slide 10 Slide 10 Page 10 Page 10 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
11
802.15.8 Peer Aware Communications
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 Peer Aware Communications First Initial WG Ballot closed June 19, Results: 60 yes, 4 no, 5 abstain % Passed! 716 comments received: 242 technical, 474 editorial 626 comments resolved or assigned. Hoping to recirculate in November Asking for one year PAR extension Slide 11 Slide 11 Page 11 Page 11 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
12
802.15.9 Key Management Protocol
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 Key Management Protocol Published! Slide 12 Slide 12 Page 12 Page 12 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
13
802.15.10 Layer 2/Mesh Under Routing (L2R)
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 Layer 2/Mesh Under Routing (L2R) Recirculation WG Ballot LB 118 closed April 30, Results: 66 yes, 4 no, 4 abstain % 49 comments Recirculation WG Ballot LB121 closed June 2, Results: 70 yes, 0 no, 4 abstain Initial Sponsor Ballot closed July 13, Results: 76 yes, 3 no, 5 abstain 136 comments, 53 MBS 83% of comments resolved Planning on recirculation in August. Slide 13 Slide 13 Page 13 Page 13 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
14
802.15.12 ULI (Upper Layer Interface)
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 ULI (Upper Layer Interface) Functional Decomposition Review Next Steps Define how KMP should work within 15.12 What does Link SAP look like? Expand the Multiplexed data service into the Multiplexed MAC interface Define how 6LoWPAN should work within 15.12 Define the Link SAP using IPv6, et al as examples Define PHY configuration using management protocols function Define MAC Configuration using management protocols function Define the Higher Layer Protocol Discrimination Entity (HLPDE) Define ULI header Unique identification of ULI presence Compression of higher layer stack and EtherType Other components? Slide 14 Slide 14 Page 14 Page 14 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
15
6TiSCH IG Changed to IETF SC September 2008 January 2009September 2008
May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 6TiSCH IG Changed to IETF SC Slide 15 Slide 15 Page 15 Page 15 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
16
Dependable IG Working on PAR and CSD September 2008
January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 Dependable IG Working on PAR and CSD Slide 16 Slide 16 Page 16 Page 16 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
17
High Rate Rail Communications IG
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 High Rate Rail Communications IG Listening contributions A KR-EU joint research project relevant to HRRC - 5G CHAMPION ( hrrc) Potential use-cases covered by 5G CHAMPION project Key technological objectives of 5G CHAMPION project Main research topics Plan for demonstration and standardization Doppler mitigation for HSR communications ( hrrc) Proposed Doppler mitigation method Pros and Cons Discussion on other issues Further technical discussions on HRRC Future potential collaboration with 16 WG Discussion on the possibility of transition to study group Slide 17 Slide 17 Page 17 Page 17 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
18
THz IG 1 joint meeting with TG3d on Tue PM1 4 contributions:
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 THz IG 1 joint meeting with TG3d on Tue PM1 16 participants 4 contributions: S. Rey (TU Braunschweig), “Simulation Results of a Phased Array at 300 GHz,” ( r00) S. Rey (TU Braunschweig), “Progress in Regulation above 275 GHz,” ( r00) Liaison statement from ITU-R WP 5A, ( r00; r00) Liaison statement from ITU-R WP 5C ( r00; r00) Slide 18 Slide 18 Page 18 Page 18 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
19
WNG SC Two presentations:
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 WNG SC Two presentations: "History and Implementation of the IEEE 802 Security Architecture” by Meareg Abreha IEEE Standards for Low Power Wide Area Networks by Jörg Robert Slide 19 Slide 19 Page 19 Page 19 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
20
Maintenance SC No Standards issues reported
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 Maintenance SC No Standards issues reported No issues with Operations Manual reported Slide 20 Slide 20 Page 20 Page 20 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
21
IETF SC Status Update: 6tisch, Core, 6lo, Roll, Detnet, and lp-wan
September 2008 January 2009September 2008 May 2008 July 2013 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 IETF SC Status Update: 6tisch, Core, 6lo, Roll, Detnet, and lp-wan Liaison communications requests/discussions Slide 21 Slide 21 Page 21 Page 21 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
22
References This document All Documents
July 2013 September 2008 May 2008 January 2009September 2008 doc.: IEEE /0697r0 doc.: IEEE /0924r0 References This document All Documents Current draft is in the members-only area Members_Only_Area members log in using username and password Slide 22 Page 22 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.