Download presentation
Presentation is loading. Please wait.
Published byΜελαινη Λαμέρας Modified over 5 years ago
1
1st System with 2 thermal links Earth/Ground at Sheath
61(Bled/WG40)54 June 2019 … Control 1st System with 2 thermal links Line Earth/Ground at Sheath Neutral Sensor …
2
Earth/Ground at Sheath
… 2nd System with 1 thermal link and 1 thermal cut-off Control Line Earth/Ground at Sheath Neutral Sensor …
3
Earth/Ground at Sheath
… Heating 19.4 Current Flow Control Clause 19.4 Line Earth/Ground at Sheath Neutral Sensor …
4
Earth/Ground at Sheath
… 19.4 Control passed Clause 19.4 Line Earth/Ground at Sheath Neutral Sensor …
5
Earth/Ground at Sheath
… 2nd System with stress corrosion crack Control Line Earth/Ground at Sheath Neutral Sensor …
6
Earth/Ground at Sheath
2nd System with scc … Control „Clause 19.5“ Neutral Reversed pol. Earth/Ground at Sheath Line Sensor …
7
Backup Showing would be passed with System 2
8
Earth/Ground at Sheath
… Heating 19.4 Current Flow Control Clause 19.5 will pass Line Earth/Ground at Sheath Neutral Sensor st step …
9
Earth/Ground at Sheath
… Heating 19.4 Current Flow nd step Control Clause 19.5 will pass Neutral Reversed pol. Earth/Ground at Sheath Line Sensor …
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.