1 Sustainable Resource Initiatives Transitioning to ZNE
CGSA Conference 2019 Pillars of Greatness April 18

2 CGSA Conference 2019 Pillars of Greatness
Charley Marchesano Chief, Energy and Sustainability Program Presenters Susan Freed Project Manager, Energy and Sustainability Program Randy Britt Vanir Chief Sustainability Officer Jenny Whitson Vanir Sustainability Project Manager CGSA Conference 2019 Pillars of Greatness

3 CGSA Conference 2019 Pillars of Greatness
Agenda ZNE background Recipe for ZNE Case Studies What’s coming up CGSA Conference 2019 Pillars of Greatness

4 CGSA Conference 2019 Pillars of Greatness
ZNE Background CGSA Conference 2019 Pillars of Greatness April 18

5 Zero Net Energy (ZNE) Definition:
An energy-efficient building/campus/portfolio/community where, on a source energy basis, the actual annual consumed energy is less than or equal to the on-site renewable generated energy. *Some exceptions for off-site generated energy

6 Zero Net Energy Categories
Campus Generate and use renewable energy within a multiple building campus to the extent possible. Portfolio Generate and use renewable energy within an owner’s portfolio to the extent possible. Community Purchase renewable energy from in-state utility for some portion of the energy used at the site with a 20-year* contract. Building Generate and use renewable energy on-site to the extent possible and cost-effective. *RECs must be owned by the electricity customer and retired by the utility. Certain process loads, such as EV charging, are excluded and do not count toward ZNE Certification

7 County of San Diego Background
Zero Net Energy Portfolio Plan 1- 2- 3- 4- 5- 6- New construction is required to be ZNE 12% CGSA Conference 2019 Pillars of Greatness April 18

8 County of San Diego Background
ZNE Inventory Occupied Construction Solicitation Occupied Facilities Alpine Library 12,700 sf May 2016 opened Imperial Beach Library 14,800 sf Apr 2017 opened North Coastal Live Well Center 54,500 sf Aug 2018 opened Borrego Springs Library 13,600 sf Dec 2018 opened Construction Phase East County ARCC 25,000 sf Fall 2019 scheduled Santa Ysabel Nature Center 6,300 sf Solicitation Ohio Street Probation Office 21,000 sf  Summer 2021 anticipated Lakeside Library 16,900  Spring 2021 anticipated Southeast Live Well Center 80,000 sf  Fall 2021 anticipated Juvenile Justice Campus 130,000 sf Fall 2021 anticipated CGSA Conference 2019 Pillars of Greatness April 18

9 Recipe for ZNE CGSA Conference 2019 Pillars of Greatness

10 Can’t I just take out the ZNE part?
What Makes it ZNE Primarily – energy efficiency Affects building form and technologies Secondly – match with renewables Design to maximize PV output Thirdly – monitor to manage All energy end uses will be submetered I have budget issues. Can’t I just take out the ZNE part? Which is hardest to accomplish? CGSA Conference 2019 Pillars of Greatness April 18

11 CGSA Conference 2019 Pillars of Greatness April 18

12 Study Feasibility Options modeling
Study options to get energy use low Determine how much PV site can support Find affordable and effective match Source: Brummitt Energy Associates CGSA Conference 2019 Pillars of Greatness April 18

13 Get the Right Team Design Build RFP Use team with prior experience!!
Consumption/production info from Feasibility study Exceed Title 24 by 20% Energy modeling requirements Measurement and verification requirements Use team with prior experience!! CGSA Conference 2019 Pillars of Greatness April 18

14 Use Advanced Technologies
LED lighting Solar PV Daylight harvesting VRF HVAC Solar thermal CGSA Conference 2019 Pillars of Greatness April 18

15 Metering End Uses CGSA Conference 2019 Pillars of Greatness April 18

16 Measurement and Verification
M&V support to manage process M&V plan Clearly ID metering products and methods Assign single point of responsibility Document Set up for monitoring M&V is not common practice and must be managed CGSA Conference 2019 Pillars of Greatness April 18

17 What happens if we don’t commission the monitoring system?
Commissioning Independent CxA Monitor design process Support M&V planning Coordinate controls installation Don’t occupy until Cx is complete What happens if we don’t commission the monitoring system? CGSA Conference 2019 Pillars of Greatness April 18

18 Commissioning CGSA Conference 2019 Pillars of Greatness April 18
Meters not commissioned PV sporadic Systems working CGSA Conference 2019 Pillars of Greatness April 18

19 Case Studies Alpine Library CARB Southern CA County Admin Bldg
CGSA Conference 2019 Pillars of Greatness

20 Alpine Library Design-build 2014-2016 Building climate zone 10
Industry-standard technologies Submeters monitoring end uses Design for ZNE + buffer 2 years of net positive 2018 performance (~4% positive) Consumption= ~105,000 kWh Production= ~109,000 kWh Source: FPB Architects CGSA Conference 2019 Pillars of Greatness

21 Analysis of Energy Use – Net Annual
CGSA Conference 2019 Pillars of Greatness

22 Analysis of Energy Use - NEM
Net Energy Metering To compensate for consumption Bank production with utility CGSA Conference 2019 Pillars of Greatness

23 Analysis of Energy Use - Daily
Net Zero doesn’t mean never using the grid Over-generation in the middle of the day But evening (peak time) spikes could be costly Daily consumption profile CGSA Conference 2019 Pillars of Greatness

24 Successes and Challenges
Alpine Library ZNE for two years ZNE req’s attracts high quality professionals Challenges Industry lack of familiarity with ZNE Control/monitoring systems coordination Natural ventilation and occupant comfort Acquisition of PV through PPA CGSA Conference 2019 Pillars of Greatness April 18

25 CARB Southern CA Consolidation Project

26 CARB Southern CA Consolidation Project
Design-build team is Hensel Phelps/ ZGF Architects/ AEI Engineers Project challenges & highlights Office/ lab space with high energy use testing equipment Limited open space for ground mounted energy generation systems Renewable Energy & Storage solutions: 3.8 MW of rooftop and carport solar generating 6,200,000 kWh annually 1.5 MW of battery energy storage Excess PV generation will offset 10% of the EV charging load Green power will be purchased from the utility for remaining EV charging energy load ZNE Status: Design is 100% complete; project under construction Projected to be 3% net-positive annual performance for the building

27 CARB Southern CA Consolidation Project

28 CARB Southern CA Consolidation Project

29 CARB Southern CA Consolidation Project
Annual Hourly Electrical Demand Profile Simulation RPU Sell-back Rate Conditions Annual Hourly Battery Discharge Simulation

30 County Administration Building ZNE Gap Analysis

31 County Administration Building
Design-build project Project challenges & highlights In the process of achieving LEEDv4 Gold Requested a ZNE Gap Analysis during the process of design Solar included in 50% design Gap analysis results: Annual kWh- 738,126 Annual renewable energy production kWh- 685,654 Annual kWh gap- 52,472 (6.1% Gap) Recommendations to reduce plug loads, increase controls and/or operational staff and occupant behavior modifications or add PV or energy storage equivalent to 45kW ZNE Status: Complete a feasibility study for additional solar and/or battery storage

32 CGSA Conference 2019 Pillars of Greatness
What’s Coming Up CGSA Conference 2019 Pillars of Greatness April 18

33 Transition toward zero carbon
Time of use rates after sundown will increase Energy storage will become requirement Codes could transition to zero carbon within 10 years All electric for heating and cooking CGSA Conference 2019 Pillars of Greatness April 18

34 Zero Net Energy During Construction
REDUCE OVERALL FUEL CONSUMPTION & DELIVERIES 1 USE ALTERNATIVE FUELS IN HEAVY EQUIPMENT REDUCE OVERALL CONSTRUCTION ENERGY CONSUMPTION HYBRID OR ELECTRIC PROJECT VEHICLES ENERGY EFFICIENT TRAILERS ON-SITE RENEWABLES AND/ OR PURCHASE REC OFFSETS Certain process loads, such as EV charging, are excluded and do not count toward ZNE Certification