Download presentation
Presentation is loading. Please wait.
1
— Construction of Grading Item Bank
Midterm Report — Construction of Grading Item Bank
2
03 Midterm Report 05 06 01 02 04 Group members Introduction Procedures
What we have done 模板来自于 05 06 Self-assessment Plans for next term 2
3
Group Members Amy Jason Betty James David Kria Emily Lucy Frank Maggie
Gary and our special supervisors :April and Gina
4
Environmentally-friendly Continuous improvement
1. How can the bank benefit us? 01 Efficiency 02 Environmentally-friendly 03 Continuous improvement
5
2. What can we get from the project?
6
Procedures 01 Field project 03 Inputting Collecting Grading 02
7
What we have done the first group The other group
60 of level 1, 30 of level 2 and 10 of level 3. 1 The other group 65 of Level of Level 2.10 of Level 3. 2
8
Something to be improved
Self-assessment Something to be improved Something we have achieved
9
Plans
10
THANK YOU VERY MUCH Construction of Grading Item Bank All the members
模板来自于 Construction of Grading Item Bank All the members 10
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.