CANADA ST. MARY & ST. SAMUEL COPTIC ORTHODOX CHURCH Smith Brothers Contracting Corp.
2
Project Details Building Type Building Size Project Dates Saint-Gobain
Religious Structure - Church Building Size 2,973 m² Project Dates June 2015 – April 2017 Saint-Gobain Products & Systems Easi-Lite®, Type X, M2Tech®, Extreme Abuse, GlasRoc®, No-Coat® Corners, Finishing Products
3
Contractor Company Name Main Representative Company Size
Smith Brothers’ Contracting Corp. Main Representative Mr. Doug Smith / Mr. Adam DeWitt Company Size Eighty-five year old company employing 50 construction professionals Specialised in Commercial Interior contractor specializing in walls and ceilings - new/renovated office space and industrial/commercial projects.
4
Building Owner Architect Contractor Innovation Partners
Saint-Gobain Project Manager St Mary & St Samuel Coptic Orthodox Church Markham, Ontario Not applicable (handled by Church) Smith Brothers Contracting Corp. Ancaster, Ontario Not applicable Kelly Graham Territory Manager CertainTeed Gypsum Canada
5
The St. Mary & St. Samuel Coptic Orthodox Church, a 2,973 square meter single-story place of worship in Markham, Ontario Canada The building’s intended use and challenging design required a high level of drywall craftsmanship and skill to achieve the ambitious interior space this church demands. The project required the highest quality drywall finishes to the church's domes and high ceiling with severe, critical lighting due to massive windows.
7
Main characteristics of this project
Overall construction included: concrete foundation/slab; structural steel; metal deck; masonry & stucco cladding; aluminum and glazing; interior finishes; mechanical, sprinklers, and electrical Domes in high ceiling required high quality finish (Level 5) due to severe, critical lighting 7,432 m² of VAP Plasterboard 4,459 m² of GlasRoc Exterior Sheathing Full range of CertainTeed Finishing products – compounds, tape, corners… and, CertainTeed Insulation
8
Durable Exterior substrate to maintain the building’s longevity and structural integrity.
9
Vast interior space required wall/ceiling construction at extraordinary heights, adding to the complexity of the project.
10
Overhead ceiling plasterboard installation acted as a smooth surface for final ceiling graphics and a high degree of scrutiny due to extreme lighting that the domes and windows create.
11
Open, lofty interior space that required plasterboard skills beyond typical wall installations.
13
Key challenges (write a max. 50 words paragraph)
e.g. Budget, Time, Space, Technical challenges before and during installation/application (Development of a new solution…) Place of worship required bright, immense and inspiring interior space Large windows offering natural daylight demanded Level 5 plasterboard finishes Busy parish with lots of visitors create high traffic in lobbies and hallways where walls and corners can sustain damage
14
Main Saint-Gobain products and systems used
Easi-Lite® Lightweight Plasterboard Used throughout all areas of the build – walls, ceilings, interior dome finish. CertainTeed Type X Fire-resistant Plasterboard Used in common areas where Fire-Resistance was specified. M2Tech® Moisture and Mould Resistant Plasterboard Room where used Link to product info/literature on local website Extreme Abuse Resistant Plasterboard Lobbies/Corridors and Common areas prone to high people traffic
15
Main Saint-Gobain products and systems used
GlasRoc® Exterior Sheathing Panels Exterior substrate CertainTeed Finishing Products (Ready-Mix & Setting Compounds, Paper Tape) All interior Plasterboard finishing stages No-Coat® High Performance Corner Products All interior 90 degree and off-angle corner finishes Sustainable Insulation® Fiber Glass Batt All exterior & select interior wall assemblies
16
Key achievements Level 5 interior wall/ceiling finish due to extreme lighting High visitor traffic in public areas - Extreme Abuse Plasterboard with No-Coat high performance corners were selected to ensure strong, durable walls while eliminating contractor call-backs Real customer success story with this project for CertainTeed: Smith Brothers Contracting used competitor joint compound and powders. New CertainTeed formulations were introduced to the contractor, who used them throughout this challenging project. They continue to use CertainTeed Finishing Joint Compound and Setting Powders on other projects – successful and sustained customer conversion. Smith Brothers also “trialed” No-Coat Corner System products on the Church and continue to use these corners on other projects.
17
ST. MARY & ST. SAMUEL COPTIC ORTHODOX CHURCH
CANADA ST. MARY & ST. SAMUEL COPTIC ORTHODOX CHURCH Smith Brothers Contracting Corp. Rob Scott Photography Credits: Name S.M & S.S Coptic Orthodox Church