Prototype cavities development
Goal: test in HNOSS of one Double-Spoke prototype cavity equipped with a coupler Status of cavities Cavity GIULIETTA stand-by (waiting for CM assembly) Cavity ROMEA + coupler Finalisation of the Labview software implementation in the RF loop: DONE RF conditioning of the 300K: DONE: Pmax=120 kW, 2.86 ms. Cool down of the cavity: ON GOING Test plan for the following weeks W12: RF conditioning of the 4K W13-14: RF test of the 4K, then 2K. from Roger yesterday Dear colleagues, This morning we have started the cooldown of HNOSS and Romea with liquid helium. By the end of the week we expect to be cold and have the Romea (fundamental) power coupler re-conditioned. Next week we will then start with our testing programme. If you or any of your colleagues are interested to attend (part) of the testing programme you are very welcome. With best regards, Roger.
2
Prototype cryomodule development See Patxi’s presentation
3
Series cavities Niobium No delay. Fabrication on schedule.
Some sheets already packed Logistics dept of CNRS “ULISSE” is preparing the first delivery Next video meeting: 30/03/2017 Cavities First set of drawing sent yesterday (74 drawings to be reviewed). Technical points still under discussion: bi-metallic joint design for the Helium outlet, annealing of some Ti helium vessel parts (to relieve stresses) Next video meeting: 24/03/2017
4
Procurements Technical specifications sent to the purchase dept of CNRS: For WP4 RF couplers Double-wall tubes Stepper motors For WP11 Heat exchangers Cryo valves
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.