Download presentation
Presentation is loading. Please wait.
Published byFelix Stevens Modified over 5 years ago
1
The projects in the following pages have been identified by our Building & Grounds Commission made up of local architects, engineers, contractors and finance council members-all of whom are Blessed Sacrament Parish parishioners. They hold the parish dear to their hearts and want what is best for the parish. All of the listed projects would be considered “out of budget” items and would require special funding to complete. NOTHING has to be done IMMEDIATELY. We are simply looking at potential projects for the next 5-10 years.
2
Blessed Sacrament Parish Town Hall April 30, 2019
For I know the plans I have for you,” declares the LORD, “plans to prosper you and not to harm you, plans to give you hope and a future. Jerimiah 29:11 Blessed Sacrament Parish Town Hall April 30, 2019
3
Sacramental statistics for our parish
Year Baptism Eucharist Confirmation Wedding Funeral Total 2010 37 36 49 10 68 200 2011 64 39 38 9 83 233 2012 32 46 72 197 2013 42 31 84 212 2014 50 43 11 71 214 2015 33 34 6 75 186 2016 53 35 45 7 79 219 2017 40 18 60 169 2018 28 23 161 393 329 327 78 664 1791
5
Fundraising and Donations
Assumption Catholic School Our budget is met with three forms of income: Tuition Parish Subsidy Fundraising and Donations The cost of educating a child in our school last year was $ Our Total School Income & Expense Budget for is $747,600
6
Hibbing Catholic School Endowment
Since it’s inception in October of 2000, the Hibbing Catholic School Endowment Fund has distributed over $750,000 from earnings to Assumption Catholic School for various projects such as tuition assistance, a new computer lab, 70 iPads for student use, a contribution to the Building fund and many others.
7
Enrollment vs Parish Subsidy
Assumption School Enrollment
8
Fundraising Efforts Assumption Catholic School
9
5 year look back at Immaculate Conception
Expenditures 13-14 14-15 15-16 16-17 17-18 18-19 Parish (General Administration) Purchased Services $ ,240.00 $ ,126.78 $ ,829.30 $ ,757.59 $ ,840.35 $ ,294.92 Rectory Plant Operation Expense $ $ ,825.70 $ ,282.82 Plant Maintenance Expense $ Church Building $ $ 20,502.57 $ 21,079.66 $ 18,204.92 $ 15,944.07 $ 17,430.99 $ 12,908.06 $ ,033.41 $ ,924.56 $ $ ,469.91 $ $ Property Insurance $ ,617.00 $ ,613.00 $ ,251.00 $ ,301.00 $ ,400.00 Total Expenditures $ 26,775.98 $ 36,748.00 $ 32,455.83 $ 30,422.57 $ 35,743.88 $ 29,534.04 Average Mass attendance 138 146 158 149 125
10
5 year look back at Blessed Sacrament
Expenditures 13-14 14-15 15-16 16-17 17-18 18-19 Parish (General Administration) Purchased Services $ ,132.00 $ ,594.75 $ ,083.45 $ ,043.47 $ ,293.70 $ ,830.91 Parking Lot / Grounds $ $ $ $ $ Rectory $ ,102.15 $ ,035.65 $ ,079.23 $ $ ,485.67 $ Plant Operation Expense $ 17,168.35 $ 15,136.43 $ 14,324.01 $ 15,414.62 $ 14,202.76 $ 12,527.53 Plant Maintenance Expense $ $ ,473.29 $ $ $ $ Church Building $ $ $ $ 17,829.27 $ 14,227.59 $ 13,916.70 $ 15,471.65 $ 13,235.88 $ 12,084.41 $ ,068.15 $ $ ,589.54 $ ,802.97 $ ,232.95 $ ,374.14 Property Insurance/campus $ 31,373.00 $ 31,873.02 $ 31,378.00 $ 31,612.00 $ 33,062.00 Total Expenditures $ 53,979.77 $ 70,550.71 $ 73,340.94 $ 77,145.39 $ 72,042.13 $ 67,545.12 Average Mass Attendance 220/310 208/298 183/281 163/241
11
Pastoral needs: Outreach to the homebound Family Faith Formation
School Expansion – Art Room & Science Lab
12
The following are deferred maintenance projects identified by the Building & Grounds Commission
13
Immaculate Conception Church
14
Crumbling ramp—estimated costs to remove & replace--$60,000
15
Handicap Accessibility
Should we consider the possibility of making the Church and social hall handicap accessible by installing a lift/elevator at ground level? Lift with new construction to renovate baptistry—$130,000 plus the cost to remove ramp This Photo by Unknown Author is licensed under CC BY-ND
16
Cleaning, tuckpointing, waterproofing & sealing of bell tower estimated $43,000 plus the cost of $43.60/brick
17
Cleaning, tuckpointing, waterproofing & sealing of main church $44,500 plus the cost of $43.60/brick
18
Circled areas on rooftop exhibit major damage from water intrusion and growth of vegetation thus causing interior damage to the choir loft walls. The entire parapet edge will need to have shingles & decking removed, area sealed, water diversion installed, decking & shingles replaced. Costs on repairs to parapet T.B.D. Estimated cost to reroof & replace gutters $39,000
19
Interior damage from leaking parapet
20
Preservation & maintenance of our stained glass
Estimated costs for repairing, re-leading, & replacing the protective covering--$35,000
21
Rectory & garage improvements such as new exterior paint and roofing—to be determined.
22
Blessed Sacrament Church
The following are deferred maintenance projects identified by the Building & Grounds Commission
23
Roof estimate to correct ice damming issues--TBD
Suggested corrective measures: Reinsulate the attic space Reinsulate eaves—no eaves Change the direction of the exhaust fan Heat tapes—too costly Replace ice & water shield on roof decking
24
Water intrusion at Blessed Sacrament
Exterior wall by Fr. Gabriel’s confessional. Water intrusion at Blessed Sacrament
25
Insurance estimate to fix interior wall water damage-$75,000
Repair & repaint the inside of the baldachin, sanctuary plaster to be able to put away the cloth panels & restore the body of the church from recent water damage---estimates coming Insurance estimate to fix interior wall water damage-$75,000
26
Tile floor replacement—asbestos removal-$20,000, floor replacement-$60,000 Removal, repair, & replacement of pews & kneelers--$145,000
27
Preservation & Maintenance of our Stained Glass
Estimated costs for repairing, re-leading, & replacing the protective covering—$102,000
28
Sound proofing three confessionals
$3500
29
Air conditioning Blessed Sacrament Church--- $40,000 budget pricing
30
Rectory balcony Reconstruction is needed on the southeast elevation cornered archway. Balcony archway deterioration caused by water infiltration. Quoted repairs $28,760 plus the cost of brick at $43.60/brick
31
North Elevation upper wall failure
Water infiltration from the roof has caused brick to bulge and deteriorate. Estimated costs for chimney removal, roof repair, repair & replacement of brick and tuckpointing--$15,000 plus the cost of brick.
32
Steam to gas conversion for Blessed Sacrament Campus-$250,000 budget price.
Savings recouped in years based on today’s steam price.
33
Stripping & refinishing
St. Leo’s Hall floor -- $13,000
34
Assumption Catholic School playground upgrade--$100,000
35
Forging ahead: Increase pastoral attention for the elderly
Estate Planning Seminars Increase pastoral attention for families Facilities Repair Blessed Sacrament Church Improve current facilities at Blessed Sacrament/classrooms Repair Immaculate Conception Church Close and alienate Immaculate Conception Property Forging ahead:
36
Next Town Hall Meeting June 4, 2019 6pm
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.