Download presentation
Presentation is loading. Please wait.
1
Peter YOU EAHC CB Coordinator
IHO-CBSC17 Genoa, Italy May, 2019 Agenda : CBSC17-06D EAHC TRDC Report Peter YOU EAHC CB Coordinator 29th June 2019
2
Overview of Session 1. Introduction / background 2. Outcome of TRDC - Development of TFT training course - Development of services and systems for IHO MSs - Creation and operation of training facilities 3. Lessons Learnt 4. Conclusions and action required 1/8
3
1. Background Establishment of TRDC
7th EAHC Coordinating Meeting (2013) Minutes 57. The Meeting approved the proposal for the establishment of the TRDC. TRDC Facilities (2014 ~ 2016) Website (2013 ~ ) Video Conference room Lecturer lounge Main Lecture room 2/8
4
Need to improve running of the TRDC website and its functions
Arising Issue IHO CB activity Limits & Needs Solution IHO (EAHC) CB activities are increasing but accumulating and sharing information is lacking. Need to improve running of the TRDC website and its functions Need to consider an infrastructure for running the e-Learning IHO MSs are requesting the CB material of the EAHC’s TFT • IHO A-1 PRO-2: The Assembly directed the IRCC to take into account e-learning in the IHO Capacity Building Strategy and to consider using e-learning in its Capacity Building activities. • 16th CBSC Action 4: ROK to liaise with Malaysia and UKHO to consider the possibility to release the TFT training material and to report back to CBSC 3/8
5
2. Outcome of TRDC Development of TFT training course
61 trainers in Basic Hydrography and Cartography, they currently deliver trainings in their own countries every year. The course material developed during those programmes is widely used by the MSs and is updated as necessary. First TFT with seven IHO participants will be held at the TRDC, ROK from 8 to 19 July 2019 Year Programme Target Participants / MSs IHO CB Fund 2013 TFT (Carto) phase1 EAHC 18 / 8 71,417 € 2014 TFT (Carto) phase 2 13 / 7 42,640 € 2016 TFT (Hydro) phase 1 17 / 10 60,000 € 2017 TFT (Hydro) phase 2 13 / 10 30,000 € 2019 TFT (Hydro) IHO 7 / 7 70,000 € 4/8
6
2. Outcome of TRDC Development of services and systems for IHO MSs
TRDC developed systems necessary for the work of the IHO, in collaboration with the IHO Secretariat. CBMS has been going through improvement and will be fully operational in 2020. adopted a fast internet service of web hosting method which led to much faster and more stable services. allocated official web-domains to temporary web addresses. No. Systems/Services Web address 1 INToGIS 2 S-100 Registry 3 Online Registration* (now) online.iho-khoa.kr 4 TRDC(e-learning) 5 SCUFN* 6 CBMS* * allocated official web-domains (2018) 5/8
7
2. Outcome of TRDC Creation and operation of training facilities
All year round Cat. B, TFT and short-term programmes are run for the EAHC and IHO MSs at these facilities. Training programmes will be conducted between June and December 2019. No. Title Venue Date Participants 1 Training for Ocean Observation and Hydrographic Surveying TRDC (ROK) 9 – 29 June 17 2 TFT for Hydro 8 – 19 July 7 3 IHO Cat. B for Carto 29 Jul. – 13 Dec. 5 + (Korean participants) 6/8
8
3. Lessons Learnt CB is the only way to resolve the technology gap between each IHO MSs. Trainings should be continued in long-term and should not be completed in a short period of time. The TRDC website should be improved to provide training materials (TFT, EAHC’s CB activities, etc.) and e-learning contents systematically with easy and convenient access. Dedicated human resources are essential for stable operation of the TRDC but there isn’t sufficient budget so more effort needs to be made. Success factors Provide various contents for different learners Easily accessible Able to download material directly 7/8
9
5. Conclusions & Actions required
TRDC dedicated to coordinate, plan and organize CB activities for the EAHC and IHO. TRDC will continue to make effort to develop the capacity of IHO MSs. TRDC can be further advanced with the interest of and feedback from MSs. TRDC welcome to working with the members of the CBSC, IHO MSs, CB Coordinators and training participants. Action required note the report take any action considered appropriate 8/8
10
Thank You Ubuntu
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.