Eric M. Reimschiissel Contractors working with Agencies

Similar presentations


Presentation on theme: "Eric M. Reimschiissel Contractors working with Agencies"— Presentation transcript:

1 Eric M. Reimschiissel Contractors working with Agencies
Tips for more cost effective projects

2 INTRODUCTION Bidding Considerations Cost effective projects
Getting the project done Traffic control Quality Control - Testing Partnering

3 BIDDING CONSIDERATIONS
Time of year to bid Project information in the documents Lump sum items - Unit cost items Street location Days of work

4 COST EFFECTIVE PROJECTS
The Right treatment at the Right time on the Right pavement. Do not expect miracles - understand the limitations of the product you are asking for Write good specifications, practical and understandable specifications with the desired treatment outcome in mind.

5 REVIEWING THE PROJECT STOCKPILE LOCATIONS STREET SCHEDULES
DAYS AND HOURS OF WORK TYPES OF SLURRY SEAL TYPES OF STREETS STREET PREPARATIONS PRODUCTION RATES – MINUTES COUNT PLANNING IS CRITICAL

6 Stockpile - staging areas are hard to find - need help
SAFETY loading and the public LOCATION closeness and access WATER SOURCE close by SUROUNDINGS DUST – TRACK OUT NOISE do not wake up the residents

7 Street schedules – project layout
FARTHEST AWAY FIRST DAILY INCREMENTS RESIDENT ACCESS RESIDENTS NORMAL ROUTES TYPES OF SLURRY SEAL STREET PREPARATION - MARKING REMOVAL EXTRA CLEANING

8 ALLOWED WORK DAYS AND HOURS
RESIDENTIAL 7:00 and open 5:00 BUSINESS - when closed SCHOOLS – special needs –weekend PARKS AND RECREATION AREAS HEAVY TRAFFIC AREAS

9 CHANGES FOR DIFFERENT TYPES OF SLURRY SEAL DURING THE DAY
DURING THE SAME DAY SET TIMES BOX SET UP MACHINE SETTINGS

10 DIFFERENT TYPES OF STREETS
RESIDENTIAL HANDICAP AND SPECIAL NEEDS ARTERIAL – HEAVY COLLECTOR TRAFFIC BUSINESS ACCESS SCHOOLS & SCHOOL BUS ACCESS HOSPITAL ACCESS SPECIAL SITUATIONS

11 SURFACE PREPARATIONS CLEANING OF THE SURFACE
PAVEMENT MARKING REMOVAL STRIPING-MARKER PROTECTION TREE TRIMMING WEEDS AND VEGITATION IRRIGATION WATER CRACK SEALING ASPHALT REPAIRS

12 TRAFFIC CONTROL TYPE OF SYSTEM REQUIRED TRAFFIC CONTROL PLAN
NOTIFCATIONS RESIDENTIAL NOTIFICATIONS PERSONAL CONTACT AGENCY AND BUSINESS FLAG PERSONS STREET CLOSURES LANE CLOSURES SPECIAL SIGNS AND TRAFFIC DEVISES

13 QUALITY CONTROL AND MATERIAL TESTING
COST VS. BENEFIT AGGREGATE TESTING EMULSION TESTING ADDITIVE AND WATER TESTING APPLICATION RATES – “VERIFY” MIX DESIGN CALIBRATIONS TEST STRIPS ON SITE SCALES

14 PRODUCTION TIME IS CRITICAL
LOADING TIME AT THE STOCKPILE SHUTTLE TRUCK TIMES TRAVEL TIME - CONSIDER TRAFFIC ACCESS LAYDOWN TIME – HAND WORK BOX WORK MACHINE SPEED – AGG TONS MINUTE CONTRACTOR MAKES MONEY ON TIME

15 AGENCY REPUTATION PREPARATION PAYMENT PARTNERING PUNCH LIST FAIRNESS

16 PARTNERING = WORKING TOGETHER
Be respectful Be Honest – Keep your word Be an asset on the project Be a mediator with the City Depts. Provide good project input Do not be adversarial – be helpful Plan ahead Be attentive

17 GOD BLESS AMERICA AND OUR TROOPS

18 WHEN YOUR NOT BUSY THINK ABOUT PAVEMENT PRESERVATION

19 THANK YOU ANY QUESTIONS