Presentation is loading. Please wait.

Presentation is loading. Please wait.

Land Assembly for Human Settlements Development Release of State Land February 2019 TOP SECRET / CONFIDENTIAL.

Similar presentations


Presentation on theme: "Land Assembly for Human Settlements Development Release of State Land February 2019 TOP SECRET / CONFIDENTIAL."— Presentation transcript:

1 Land Assembly for Human Settlements Development Release of State Land February 2019
TOP SECRET / CONFIDENTIAL

2 Structure of the Presentation
Background Spatial Transformation and Consolidation Human Settlements Spatial Vision National Development Plan 2030 Status of National Public Works Land Released to Date Prioritised National Public Works Land Identified for Human Settlements Conclusion TOP SECRET / CONFIDENTIAL

3 MTSF Focus Implementation of a coherent programme to transform human settlements and to ensure that the delivery of housing is used to restructure towns and cities and strengthen the livelihood prospects of households and overcome apartheid spatial patterns 7/4/2019

4 Human Settlements Framework for Spatial Transformation & Consolidation
Objectives Eliminate legacy imbalances in the distribution of housing typologies in developments Ensure the delivery of services towards a more inclusive & integrated residential landscape Build inclusive residential markets Principles Spatial justice Spatial Efficiency Access to Connectivity, Economic and Social Infrastructure Access to Adequate Accommodation Provision of Quality Housing Options 7/4/2019

5 Release of State Land for Human Settlements
During the State of the Nation’s Address(SONA 2019), the Honourable President Mr Cyril Ramaphosa pronounced that, “ strategically located land will be released to address human settlements needs in urban and peri-urban areas” Secret / Confidential

6

7

8 National Development Plan (NDP) 2030 Vision and Trajectory
By 2050 visible results from effectively coordinated spatial planning systems shall have transformed human settlements in South Africa into equitable and efficient spaces with citizens living in close proximity to work with access to social facilities and necessary infrastructure. By 2030 we strive to achieve measurable progress towards breaking apartheid spatial patterns with significant advances made towards retrofitting existing settlements offering the majority of South Africans access to adequate housing, affordable services in better living environments, within a more equitable and functional residential property market.

9 Development Status of Released Public Works land
PROVINCE MUNICIPALITY PROPERTY DESCRIPTION EXTENT (HA) DEVELOPMENT STATUS Gauteng City of Jo'burg Farm Zuurbult 240 IQ Lufhereng catalytic development currently at implementation stages. North West Kgetlengrivier LM Ptn 25 of farm Rietfontein 372 Township establishment stages Western Cape Theewaterklloof Potion 4 of the Remainder of farm Soopjesvlakte 301 Implementation stages. Remainder of Portion 1 of farm Jagersvlakte 292 City of Cape Town Erf Strand 2.7000 Rezoning Planned. Eastern Cape Makana LM Remainder of Portion 1 of the farm Donkerhoek 276 Township establishment stages TOTAL

10 Summary of NDPW Land Identified
PROVINCE EXTENT (HA) DEVELOPMENT POTENTIAL WESTERN CAPE Units GAUTENG 9 500 Units KWAZULU NATAL 8 300 Units NORTH WEST 3 600 Units MPUMALANGA 5 076 Units NORTHERN CAPE 7 430 Units FREE STATE 1 975 Units EASTERN CAPE 700 Units TOTAL Units 7/4/2019

11 DEVELOPMENT POTENTIAL
IDENTIFIED NATIONAL DEPARTMENT OF PUBLIC WORKS LAND FOR HUMAN SETTLEMENTS DEVELOPMENT WESTERN CAPE PROVINCE MUNICIPALITY PROPERTY DESCRIPTION EXTENT (HA) DEVELOPMENT POTENTIAL NEED AND DESIRABILITY CITY OF CAPE TOWN Milnerton Erf Blaauwbergstrand 8 310 mixed income housing opportunities The proposed development is earmarked to accommodate primarily low and gap housing within the greater Milnerton area. Erf Wingfield 7500 mixed income housing opportunities The proposed development is earmarked to accommodate the greater Gugulethu informal settlements Erf 2772 Eversdale (Durbanville) 3.6010 180 social housing units Spatial transformation and urban consolidation SALDANHA BAY Erven1167,1178,1227, 1289,1349,1409,1459, Saldanha Bay 8,4299 400 mixed income units Gap housing development Portion of Portion 1 of the Farm Klipvlei No Saldanha RD 38.93 850 units Low income housing STELLENBOSCH Erf 64 Kylemore 18.77 500 units Low income / Gap housing SUB TOTAL UNITS 7/4/2019

12 DEVELOPMENT POTENTIAL
IDENTIFIED NATIONAL DEPARTMENT OF PUBLIC WORKS LAND FOR HUMAN SETTLEMENTS DEVELOPMENT GAUTENG PROVINCE PROVINCE MUNICIPALITY PROPERTY DESCRIPTION EXTENT (HA) DEVELOPMENT POTENTIAL NEED AND DESIRABILITY GAUTENG CITY OF JOHANNESBU RG Portion 32 (a Portion of Portion 9) of the Farm Waterpan 292 IQ 6000 mixed income units The proposed development is part of the approved Syferfontein catalytic project. CITY OF TSHWANE Remainder of Portion 153 of the Farm Elansdsfontein 352 352 JR 3500 low income units The proposed development is earmarked to accommodate Atteridgeville informal settlements SUB TOTAL 9 500 units 7/4/2019

13 IDENTIFIED NATIONAL DEPARTMENT OF PUBLIC WORKS LAND FOR HUMAN SETTLEMENTS DEVELOPMENT
KWA-ZULU NATAL PROVINCE MUNICIPALITY PROPERTY DESCRIPTION EXTENT (Ha) NEED AND DESIRABILITY KZN MTUBATUBA Remainder of the Farm Elderslie No 2152 Tenure upgrading for 10 000 already developed low income housing units Dukuduku Settlement Portion 1 of the Farm Elderslie No 250 The Farm Spurwig No 209 Dukuduku Wetlands No 5709 SUB TOTAL 8 320 10 000 title deeds 7/4/2019

14 DEVELOPMENT POTENTIAL
IDENTIFIED NATIONAL DEPARTMENT OF PUBLIC WORKS LAND FOR HUMAN SETTLEMENTS DEVELOPMENT NORTH WEST PROVINCE PROVINC E MUNICIPALI TY PROPERTY DESCRIPTI ON EXTENT (HA)  DEVELOPMENT POTENTIAL NEED AND DESIRABILITY NORTH WEST Mafikeng Rooigrond 135 JQ 3600 low income units Informal settlements upgrading (Rooigrond) SUB TOTAL 3 600 units 7/4/2019

15 DEVELOPMENT POTENTIAL
IDENTIFIED NATIONAL DEPARTMENT OF PUBLIC WORKS LAND FOR HUMAN SETTELMENTS DEVELOPMENT MPUMALANGA PROVINCE PROVINCE MUNICIPALITY PROPERTY DESCRIPTION EXTENT (HA) DEVELOPMENT POTENTIAL NEED AND DESIRABILITY MPUMALA NGA MBOMBELA Portion of the farm Dingwell 276 JT 5000 low income units Informal Settlements Upgrading (Msholozi informal Settlement) EMALAHLENI Erf Witbank Extension 16 1.5618 60 gap housing units Gap housing development Erf 696 Del Judor 0.5070 16 SUB TOTAL 5 076 units 7/4/2019

16 NORTHERN CAPE PROVINCE DEVELOPMENT POTENTIAL
IDENTIFIED NATIONAL DEPARTMENT OF PUBLIC WORKS LAND FOR HUMAN SETTELMENTS DEVELOPMENT NORTHERN CAPE PROVINCE PROVINCE MUNICIPALITY PROPERTY DESCRIPTION EXTENT (HA) DEVELOPMENT POTENTIAL NEED AND DESIRABILITY NORTHERN CAPE Ga-Segonyana Erf Kuruman 3000 mixed income units The proposed development is part of the N14 priority Corridor development and Mining Towns Programme. Kgatelopele Erven 611, 612, 613 Danieskuil 12,6 480 mixed income units Mining Towns Programme development Portion of erf 1, erven 584 to 599 Danieskuil 246 David Kruper Erf 456 Olyvenhoutsdrift 74 900 low income units Informal settlement upgrading Pokwane Portion 174 of the farm Gelldenskat 36 0,9572 50 low income units SUB TOTAL 7 430 units 7/4/2019

17 DEVELOPMENT POTENTIAL
IDENTIFIED NATIONAL DEPARTMENT OF PUBLIC WORKS LAND FOR HUMAN SETTELMENTS DEVELOPMENT FREE STATE PROVINCE PROVINCE MUNICIPALITY PROPERTY DESCRIPTION EXTENT (HA) DEVELOPMENT POTENTIAL NEED AND DESIRABILITY FREE STATE Kopanong Portion 49 of Farm Bethulie 303 RD 8.1521 232 low income units Informal settlement upgrade Letsemeng Holding 236 Riet River Settlement East 433 low income units Informal settlement upgrading Phumelela Portion of the Remainder of farm Krynaauws Lust No /THEMEBELIHL E EXTENSION - VREDE 113,0257 1310 low income units Township formalization SUB TOTAL 1 975 units 7/4/2019

18 DEVELOPMENT POTENTIAL
IDENTIFIED NATIONAL DEPARTMENT OF PUBLIC WORKS LAND FOR HUMAN SETTELMENTS DEVELOPMENT EASTERN CAPE PROVINCE PROVINCE MUNICIPALI TY PROPERTY DESCRIPTIO N EXTENT (HA) DEVELOPMENT POTENTIAL NEED AND DESIRABILITY EASTERN CAPE WALTER SISULU Portion 8 of the Farm No Albert RD 31 700 Low income housing SUB TOTAL 700 units 7/4/2019

19 Conclusion The identified NDPW outlined above represents first batch of state land held nationally by Public Works required for Human Settlements development purposes. In line with the Inter Ministerial Committee Land Reform mandate relating to the ccelerated Land Reform Programme, the identified properties can be released by way of a Power of Attorney in favour of human settlements to ensure immediate development and infrastructure planning. The location of some of NDPW land is critical to achieve spatial transformation through integrated sustainable human settlements Secret / Confidential

20 “We have come a long way – Celebrating 20 Years of Freedom!”
THANK YOU “We have come a long way – Celebrating 20 Years of Freedom!”


Download ppt "Land Assembly for Human Settlements Development Release of State Land February 2019 TOP SECRET / CONFIDENTIAL."

Similar presentations


Ads by Google