Brown County General Hospital Virtualization Project
By: Nicholas Duncanson
2
Project Description and Deliverables
VI3 Cluster Install and Configuration 3 ESX Servers Fibre SAN for backend 1 Backup Server Attached tape Library Running Symantec Backup Exec Server Migration Convert several physical servers to virtual machines
3
Intended Use Replace old server hardware Reduce overall IT costs
Provide room for future growth Curb ‘server sprawl’
4
User Profiles BCGH IT Staff End Users Administration and Maintenance
Utilize the same services already in place
5
Testing Create test VM for a server, and verify all services work properly Have end users test the VM Delete the VM, and create a real VM, taking down the physical server Leave original server in place for at least one month after VM comes online Verify with end users that the server is working properly daily Check Virtual Center daily for alerts
6
Network Diagram
7
Storage Area Network
8
Fibre Switch for SAN
9
Fiber Switch Configuration
10
NS22 Configuration
11
ESX Servers
12
Demo
13
Conclusion Servers Virtualized VMWare VI3 Infrastructure in place
Project successful
14