Download presentation
Presentation is loading. Please wait.
1
CICA Project of the Year Entry Template
2
Scope of the project --- 2 Points
Location Client
3
Scope of the project--- 4 Points
Description of the lift (detailed overview of the project, please also provide videos or photos if available)
4
Project Methods --- 5 points
Resources crane used, rigging gear, other lifting equipment selection methods and engineering controls (provide calculation, lift plan, drawings or other supporting document)
5
Project Methods --- 5 points
Methodology and sequences of operation
6
Project Methods --- 10 points
Innovation (describe your challenge, why innovation is needed and your solution. Provide calculations and drawings or other supporting documents)
7
Planning and control --- 20 points
How were the risks controlled? How did you reduce the hazards and control the challenges? Risk assessment (Site SWMS, JSAs, signed by all involved) Comply to Australian Standards and manufacturer specification Attach additional documents for this section
8
Planning and control --- 10 points
Equipment selection methods and engineering controls (provide calculation, lift plan, drawings or other supporting document)
9
Planning and control --- 3 points
Time management (programs, timetable and describe coordination to deliver the scope) Attach additional documents for this section
10
Site condition ---15 points
Environmental factors (site restraints, challenges, solutions) Physical difficulties and/or Location logistics
11
Site condition --- 5 points
Ground condition Attach drawings or geotechnical reports
12
Lift Complexity --- 20 points
Describe design and technical challenges
13
Customer satisfaction ---5 points
Client testimony if applicable Attach evidence.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.