1 Job Responsibilities of Sr
Job Responsibilities of Sr.Project Manager, in the office of Superintending Engineer (PR&ALDC) HPSEBL Control Centre, Totu, Shimla, Himachal Pradesh.

2 “I am responsible for gathering, processing & displaying information about HPSEBL power system and making it available online”.

3 Modules & Scheduling Processes
OA Consumer Data, Schedule of Power Purchase by Open Access Consumers through Exchange. STOA Scheduling Acceptance Archives Generator Due Bills Monitoring MEETINGS OCC, NRPC/TCC, TEST SUB COMMITTEE & STANDING COMMITTEE Meetings Day Ahead Schedules Reports Schedule/ Archives

4 REAL TIME MASTER DISPLAY –
HPSEBL REAL TIME MASTER DISPLAY – SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM 

5 CONTENTS Prime Responsibilities
Centralized Data Storage & Maintenance of Reports Handling & reconciliation of GoHP Power UI a/c Online Data acquisition for Decision Support System Daily creation and analysis of power system data for identification of errors through AAR report to support MIS Maintenance of Software Cell Servers Safeguarding of networks through Firewall Other Random Miscellaneous Jobs Objective of Operations

6 Prime Responsibilities:
Smooth functioning of ALDC website Maintenance of Internet Information Server Scripting new modules Monitoring Reports on a pre specified nomenclature- e.g. ‘fileNm-ddmmyy’ i.e. “DPS ” Managing & creating monthly reports section on basis of daily reports Website Security Search engine optimization of web site Periodic backups of website

7 Smooth functioning of Database Oracle 8i MS Access 2010
MS SQL Server 2005 Performing periodic data backups Updating with online patches and hot fixes Database tuning and performance monitoring Replication of data to ensure its availability to web services  Capacity planning in new & old database design & implementation Maintaining data dictionary & privileges along with technical troubleshooting Working in Data Management, Data Collection, Database Development, Data conversion, Data correction/ fixing, Data control & Data Reporting.

8 Smooth functioning of Decision Support System Software Application Smooth functioning of Data Down-loaders from downloading of all the online relevant data from various online sources (viz NRLDC, NRPC, NLDC & IEX) Smooth functioning of Data Parsers in order to make the already installed programs at s/w cell to understand the same. Smooth functioning of Data Convertors for extraction of the relevant information from the data and its storage in the database management tool. Tracking essential alterations in a, b, & c and making note of each one of them. Periodic debugging of scripted modules for a, b, & c. Application tuning and performance monitoring. Periodic Backups of new and old modules. Historical data retrieval and disturbance analysis.

9 Centralized Data Storage & Maintenance of Reports
All the reports have been archived without a miss (also updated on Sundays & in all holidays) in the central database server and are accessible through our web portal Most of reports have been made available from FY 2007 and few even from FY 2005.

10

11 Useful Links

12 Presentation

13 Reports

14 List of Reports SN Report Short Name Creation Point Database Archiving Daily Reports > Day Ahead Disposal > 1 Day Ahead Disposal DADISPO Control Room Shift S/W Cell 2 Day Ahead Schedule DA 3 Actual v/s Anticipated DERFVsA 4 Daily Generation of Own Power Houses  DGOPH 5  Daily Power Supply Schedule DPS 6 Details of Energy Sale/Purchase at the platform of IEX  OAINOUT PC Unit 7 Anticipated Vs Actual Generation AAG 8 Graphical Analysis GA Shut Down > 9 Daily Shut Down Report DSR 10 Approved Planned Shutdown APSD 11  Un-Planned Shutdown UPSD

15 SN Report Short Name Creation Point Database Archiving 12 Actual Availability & Requirement Schedules AAR S/W Cell 13 Actual Real Time Data RTC Control Room Shift 14 Power Transaction Analysis PTA PC Unit 15 Anticipated Vs Actual Power Supply Position APSP 16 Daily Hourly Load Schedule DHL 17 Power Supply Position (NRLDC) PSPR 18 Daily Hourly Industrial Load DHIL GoHP Power > 19 Summary of GoHP Power Scheduled to Export SGOHPEXP 20 Actual Vs Implemented Schedules for GoHP Power SAVI 21 Daily GoHP Power DGP 22 Entitlement GOHPSHARE 23 GoHP Power Share Scheduling GPSS

16 SN Report Short Name Creation Point Database Archiving 24 Load Shedding DLS Control Room Shift S/W Cell 25 Daily Outages Report DOR 26 Daily Tripping Report DTR 27 Daily Demand Dwaral & Frequency DDDF Daily Summary > 28 Daily Power Supply Monthly Summary SDPS PC Unit 29 Over Drawal / Under Drawal Summary SODUD 30 Actual Availability & Requirement Summary Schedules SAAR 31 Anticipated Vs Actual Power Supply Position Summary SAPSP 32 Summary Generation of Own Power Houses SGOPH 33 Tripping Report Summary SDTR 34 Frequency Based Drawal of HPSEBL FBDRW

17 SN Report Short Name Creation Point Database Archiving Monthly Reports > 35 Month Wise Summary of Power Supply SDPS PC Unit 36 Month Wise Summary of Over Drawal / Under Drawal SODUD Availability & Requirement > 37 Month Wise Summary of Consolidated AAR SAAR S/W Cell 38 Average AAR AAR-AVG 39 Month Wise Summary of Anticipated Vs Actual Power Supply Position SAPSP 40 Monthly Report on Daily Generation of Own Power Houses SGOPH 41 Monthly Gen Small Hydro Projects GOMSHP Power Transaction Analysis > 42 Monthly Archives (PTA) PTA GoHP Energy Account > 43 GoHP Power UI A/C GOHPUI 44 GoHP UI Annual Abstract Consolidated_GoHP_UI_AC 45 GoHP Power Share Scheduling Year Wise GPSS

18 SN Report Short Name Creation Point Database Archiving GoHP Power > 46 Actual Vs Implemented Schedules for GoHP Power SAVI S/W Cell 47 GoHP Export SGOHPEXP Generation & Availability > 48 Monthly Generation and Availability DGA PC Unit 49 DGA Yearly Abstract Abstract_DGA 50 Month Wise Summary of Daily Frequency NRFREQ 51 Implemented OD UD Details OD-UD by HPSEBL (as per DSA) 52 UI A/C Supporting Data as per DSA Comparative Report UI_AC_Supporting_Data 53 Northern Region Final Regional Energy Account REA

19 SN Report Short Name Creation Point Database Archiving List of Commercial Reports 54 Daily Summary of Energy Transaction on IEX Platform IEXDS PC Unit S/W Cell 55 Monthly Abstract of Energy Transaction of IEX Platform IEXDOR 56 Grand Abstract of Energy Transaction on IEX Platform IEXAPT 57 Detail of Energy Purchased at the Platform of IEX IEXIMPAPT 58 UI Account MMM-YYYY 59 Reactive Energy Account REA_Weekwise_FY

20 SN Report Short Name Creation Point Database Archiving Open Access 60 OA Consumers Data  OA Modue S/W Cell 61 Open Access Consumers Data Module SnapShots  Snap Shots 62 Monthly Summary of OA Consumers Data February 2019 January 2019 December 2018 …. 63 Short Term Open Access (STOA) Scheduling Acceptance Reports Archives App00 for Application STOA00 for Concurrence PC Unit 64 STOA Procedure STOA_Procedure 65 Multi Year Tariff Order for HPPTCL STU On line Data Punched by OA Consumers  OA Report Generator Bills Module  Bill Module SnapShots of Generator Bills Module Generator Bills Report  Due Bill Report

21 SN Report Short Name Creation Point Database Archiving 66 Short Term Open Access-New User Manual --- PC Unit S/W Cell 67 View STOA Transactions 68 STOA Scheduling 69 STOA Procedure 70 Open Access Charges & Losses 71 STU 72 HPSEBL 73 Procedures 74 Medium Term Procedure 75 Long Term Procedure 76 Grant of Connectivity 77 Regulations 78 HPERC CERC 79 Draft Amendments 80 Public Notice 81 Draft Notofication 82 Explanatory Memorandum 83 Public Hearings 84 Unscheduled Interchange 85 Forbearance & Floor Price 86 Transmission Pricing

22 SN Report Short Name Creation Point Database Archiving 87 Acts Issued --- PC Unit S/W Cell 88 Electricity Act, 2003 89 Indian Electricity Act, 1910 90 Electricity Regulatory Commissions Act, 1998 91 Electricity (Supply) Act, 1948 Schedule Vs Actual 92 Implemented Drawal Schedule of HP from ISGS DRWYYYYMMDDR00 DRW_IMP 93 Bilateral OpenAccess Implemented Schedules Summary YYYYMMDDR00 BOA-YYYYMMDD 94 Real Time Master Display SCADA_CorporateOneLines SIEMENS 95 Frequency Vs UI Rate uiRate Meetings 96 NRPC/ TCC Meetings Notice, Agenda, Discussion Notes, Highlights & Minutes S/W Cell & 97 OCC Meetings 98 Telemetry, SCADA and Telecommunication (TeST) Sub-Committee Meetings 99 Standing Committee Meetings Notice, Agenda, Presentation & Minutes

23 SN Report Short Name Creation Point Database Archiving Trends 100 Demand Restricted Demand (Historical Data) 101 Graph Availability Vs Demand Graph:GraphAAD-2018GraphAAD-2017 102 Month Wise Yearly Generations Station wise Generation Graphas 103 Graph Forecasted Vs Actual Demand & Actual Availability Scenario 104 Yearly Generation & Availability Comparative Summary GenYear GenYear S/W Cell 105 Graph Own Generation of HPSEBL from 2011 to 2015 OGCHART 106 Graph Own Generation of HPSEBL in 2015 OGCHART2015 107 Graph Average Frequency of NR Grid in AFREQNR Power System 108 E-Shift System Integration Current Status e-Shift Control Room Shift 109 Generating Units whose Power is scheduled to HPSEBL System GUHPSEBL

24 SN Report Short Name Creation Point Database Archiving Downloads 110 Download Center S/W Cell 111 List of Presentations Presentations Control Room 112 Master Display (Real Time Data) SCADA_CorporateOneLines SIEMENS 113 Control Room Shift Groups SHIFTEAM 114 E-Shift System Integration Current Status e-Shift Control Room Shift Losses 115 Regional Transmission Losses, Currently Effective 116 Previous Archives Losses LossesAll 117 Losses Old Format LossesOld 118 NRLDC Losses Notifications NRlosses CERC 119 Draft Amendments Public Notice, Draft Notification & Explanatory Memorandom PC Unit 120 Public Hearing Unscheduled Interchange, Forbearance, Floor Price & Transmission Pricing 121 Acts Issued Electricity Act 2003, Indian Electricity Act 1910, Electricity Regulatory Commion Act 1998 & Electricity (Supply) Act 1948

25 SN Report Description Creation Point Database Archiving Maps 122 Atlas of HPSEBL Power Grid -HPSEBL (66kV & Above) -220 kV Sub-Stations/ Power Houses - 132 kV Sub-Stations/ Power Houses - 66 kV Sub-Stations/ Power Houses Communication Unit S/W Cell 123 Network Diagram of HPSEBL (66KV & above) MAP1 124 Hydel Power Potential HP MAP2 125 HP Grid Map MAP3 126 HP Power Map MAP4 Weather 127 India Meteorological Department WebLinks 128 India Weather 129 Meteorological Centre Shimla 130 Nowcast 131 District wise Weather warning (7 Days) 132 Weather Forecast (5 Days) nwp.imd.gov.in/bias/services.php Other Reports 133 Net Logs of non availability of Internet from Power Grid Net Logs 134 Archives of various Reports from 2005 Losses, Implemented Schedules, RTD, DHL, PTA & DGA S/W Cell  135 Disclaimer 136 Contact Us TelephoneDirectory 137 On Line Scheduling, Report Generation & Decision Support System DSS 138 MYT (Multi-Year Tariff) Petition for 3rd Control Period Business Plan-HPLDS, HPLDS MYT formats & MYT-HPLDS 139 Graph on Home Page (Frequently changed) GraphHome 140 What’s New Announcements on Scroll at Bottom Home Page Meetings, Latest Energy Accounts & General

26 Handling & reconciliation of GoHP Power UI a/c
Handling Sale of GoHP Power as per GOI guidelines under “Short-Term Open Access” procedure & reconciliation of GoHP Power UI a/c w.e.f. April 2008, by using automatic schedulers. A GoHP Power Fax is generated and uploaded on daily basis on the web site. Message-A: The availability of GoHP Power scheduled to PTC as per Entitlement Schedule of NRLDC at 11 AM. This availability is subject to change in the ‘Net Drawal’ and ‘Final Drawal’ to be issued by NRLDC at 17:00 Hrs and 23:00 Hrs. A1-Details of Free Power, Equity Power, SOR, Unallocated Share, GoHP power to out site HP & GoHP power to HPSEBL calculations in 15 minutes blocks from GoHP Stations as per Entitlement issued by NRLDC. Message-B: The availability of GoHP Power scheduled to PTC as per Revision-0 “Net Drawal Schedule’ of NRLDC at 5 PM. This availability is subject to change in the ‘Final Drawal’ (Rev-1) to be issued by NRLDC at 23:00 Hrs. B1- Details of Free Power, Equity Power, SOR, Unallocated Share, GoHP power to out site HP & GoHP power to HPSEBL calculations in 15 minutes blocks from GoHP Stations as per Revision-0 Net Drawal Schedule issued by NRLDC. Message-C: The availability of GoHP Power scheduled to PTC as per Revision-1 “Final Drawal Schedule’ of NRLDC at 11 PM. This availability is based on the ‘Final Drawal’ (Rev-1) to be issued by NRLDC at 23:00 Hrs. C1- Details of Free Power, Equity Power, SOR, Unallocated Share, GoHP power to out site HP & GoHP power to HPSEBL calculations in 15 minutes blocks from GoHP Stations.

27 Daily creation and analysis of power system data for identification of errors through AAR Report to support MIS: Compilation & analysis of Actual Availability and Requirement of HPSEBL (AAR report) with graph & Summary reports (SAAR). Actual power supply system status of previous day is being daily analyzed by S/W Cell through Actual Availability and Requirement (AAR) report, which is further compared with daily power supply position (DPS) report. This comparative analysis checks & rectified errors, if any, in DPS data & as well as in AAR data. It involves analyzing of data in detail in order to track the system. The power supply system has been break down into 96 time blocks in this comparative analysis. Maintenance of Software Cell Servers The ALDC software cell is currently equipped with three servers: Web Server Database Server-1- Oracle Backup Server The periodic software & hardware overhauling of these servers is also done by S/W cell itself.

28 Safeguarding of networks through Firewall
At ALDC we have a Cyberoam firewall installed in order to secure our networks. This firewall is used to prevent unauthorized Internet users from accessing private networks connected to our network. All messages entering or leaving the intranet are made to pass through the firewall. Which examines each message and issues digital signatures for the valid ones and blocks the malicious ones which do not meet the specified security criteria. This firewall also acts as the central hub of all the connections to various locations of HPSEBL including the main office and Sub-ALDC at Hamirpur. Maintenance of this hardware firewall is another major responsibility of the S/W cell. Firewall H/W Anti Virus with Intrusion Prevention System (IPS) Virtual Firewall Logically configured/ divided IPS Thread management system Configuration of web server Configuration of network interface (Zone: LAN, WAN, interface Ports, IPs with netmask) Net policy Band width management We can configure 512 kbps to all nodes if not used then shared on network.

29 Other Random Miscellaneous Jobs
Instant assistance to Control Room (24X7) Interface with various corporations for technical support & assistance in technical liaisons with IT wing at NRLDC & others. IEX/PXIL HP/IBM/DELL/Wipro Other local vendors First hand trouble shooting of H/W & S/W of all adjoining branches in ALDC complex. Assistance to staff in creating Technical documents and presentations. Virus appearance checkup, if found recovering from virus attacks Tracking the smooth functioning of internet & intranet. Updating internet availability information Logs. Working as part of a team and provide 24X7 supports when required.

30 Objective of Operations
The ALDC S/W cell has been constituted in the year April, 2007 for carrying out handing of Sale of GoHP Power under “Short-Term Open Access” procedure through PTC, TATA etc. After the development of in house software application, the scope of the work has further increased, it is not only confined to the handling of sale of power of GoHP but also responsible for gathering, processing, displaying information about HPSEBL power system and making it available online. This process involves creation of a centralized resource of seamless data such that online dispatch of power i.e. scheduling of HPSEBL’s power under all transactions viz. sale through open tender, bilateral agreement, banking, energy accounting, generation of various reports, collection of data from various sources, and other random analysis could be carried out and come of the manual processes could be automated so that they can become error free. This project is intended to expand on computerized load dispatch and communication facilities which are an essential requirement in managing the control centre operations encompassing a large and complex interconnection it involves lot of research & development in order to produce new state of the art tools and techniques to equip ALDC with better control on power management by carrying out methodologies for data acquisition & storage which shall be made available as online archives for analyzing trends of power generation and executing beneficial power trading with other power entities with the help of a decision support system which can be used for accurate forecasting of power generation and a user interactive management information system for better power merchandising so as to run the power system at maximum economy, and for getting real time information for speedy and efficient decision-making. It is also going to provide support on account of historical information management, matching of forecasted & actual demand & load flow trends, reduction of meticulous human planning for day-ahead schedules and regulation of own generation according to frequency profiles as per the historical data scenarios & other planning and contingency analysis.

31 your attention & valuable time
Thank you for sparing your attention & valuable time