Download presentation
Presentation is loading. Please wait.
1
Nogales DC Tie Capacity
11/14/17
2
Anticipated Capacity UNS Electric System
Gateway – Valencia: Studies based on 150MW transfer across DC tie Gateway – Vail: Studies based on 150MW transfer across DC tie Tucson Electric System Vail – Palo Verde: TTC/ATC available on OASIS
3
Future Project Upgrades
Southline Transmission Project Potential buy-in to Southline Project Visit Southlinetransmissionproject.com for additional information Jojoba Interconnection Interconnects the Jojoba Substation to the Pinal West – Hassayampa transmission line Exact MW increase to be based on studies
4
Process for Acquiring Capacity
Submit Transmission Service Requests through TEP and UNSE OASIS websites Submit a written application utilizing the respective Long-Term Firm PTP Transmission Service Applications located in the “Applications” folder on the OASIS websites Transmission Coordinator will review application for completeness Transmission Coordinator will determine how request can be accommodated based on POR/POD If transmission is available then a Transmission Service Agreement will be provided If transmission is not available then a System Impact Study will be conducted to determine the upgrades necessary to meet the request
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.