OVERVIEW: BUILDING ENERGY PERFORMANCE- ENERGY MONITORING INFORMATION SYSTEM
Integrated online platform for ECBC COMPLIANCE and BUILDING ENERGY MONITORING
2
SALIENT FEATURES OF THE TOOL
ECBC COMPLIANCE BUILDING ENERGY MONITORING Facilitates COLLABORATION among stakeholders STRUCTURED and GUIDED compliance procedure SEAMLESS workflow, interweaving functionalities of different Users EASY TO USE and INTUITIVE User Interface CUSTOMIZED Interface caters to various user groups Real-time tracking of ONGOING Energy and Demand MONITORING (via. Smart meters) Different hierarchies (National, State, ULB, Building) and time period (daily/weekly/annually/custom) Customizable DASHBOARDS for different user groups Assess building performance based on metrics Energy Performance Index (EPI) Daily Energy Use Building Rating (Future Provision) Update building information (Typology, Occupancy, etc.)
3
ECBC COMPLIANCE
4
PROCESS FOR ECBC COMPLIANCE THROUGH
EMIS TOOL Empaneled Firm (Buildings) DESIGN TEAM WITH TECHNICAL EXPERTISE OWNER ECBC eligible building 1. Submit construction and compliance documents 2. Site inspection and document scrutiny and verification 3. Gives ECBC compliance certificate 5. Occupancy Certificate 6. Energy use data transfer through smart meters 4. Submit ECBC Compliance certificate from Empaneled Firm at different construction stages AUTHORITY HAVING JURISDICTION Building Energy Performance Dashboard END USER/ Owners SDA + BEE 8. PENALITIES AND INCENTIVE (as decided by state government) 7. EPI report
5
PORTAL HOME PAGE
6
LOGIN PORTAL
7
PROJECT INFORMATION
8
PROJECT INFORMATION
9
ONLINE SELECTION OF EMPANELED FIRM
10
ENERGY AND DAYLIGHT REPORT GENERATION
11
BACKEND ENERGY SIMULATION OUTPUT
PROPOSED CASE ENERGY MODEL IS UPLOADED AS SUBMISSION IN idf FORMAT
12
REVIEW AND RAISE ISSUE
13
NON-COMPLIANCE/ INSUFFICIENT DOCUMENTS
CREATE ISSUE: NON-COMPLIANCE/ INSUFFICIENT DOCUMENTS
14
CERTIFICATE GENERATION
15
EMPANELED FIRM OWNER OWNER OWNER DESIGN PHASE CONSTRUCTION PHASE
COMPLETION PHASE FORM III (GENERATE) FORM VII (GENERATE) FORM X (GENERATE) ON SATIFACTORY SUBMISSION BY OWNER AND VERIFYING COMLIANCE ON SATIFACTORY SUBMISSION BY OWNER AND INSPECTION OF COMLIANCE ON SATIFACTORY SUBMISSION BY OWNER AND INSPECTION OF COMLIANCE SUBMIT SUBMIT SUBMIT OWNER OWNER OWNER
16
OWNER APPROVING AUTHORITY APPROVING AUTHORITY APPROVING AUTHORITY
DESIGN PHASE CONSTRUCTION PHASE COMPLETION PHASE FORM II (GENERATE) FORM II (GENERATE) FORM II (GENERATE) FORM III (FROM EMPANELED FIRM) FORM VII (FROM EMPANELED FIRM) FORM X (FROM EMPANELED FIRM) SUBMIT SUBMIT SUBMIT APPROVING AUTHORITY APPROVING AUTHORITY APPROVING AUTHORITY
17
BUILDING ENERGY MONITORING
18
ULB LEVEL: ENERGY USE MATRIX
SIMILARLY, NATIONAL, STATE AND BUILDING LEVEL DATA CAN BE VIEWED
19
PROJECTS BEING MONITORED
20
ENERGY USAGE PATTERN
21
PROJECT WISE: ENERGY USAGE PATTERN
22
ENERGY USE MATRIX
23
TIME PERIOD WISE: ENERGY USAGE PATTERN
24
BUILDING LEVEL: ENERGY USE MATRIX
25
ENERGY USE MATRIX
26
THANK YOU !