Download presentation
Presentation is loading. Please wait.
Published byJocelyn Morgan Modified over 5 years ago
1
Confirmation of communication options for GT/UIP submissions to Cadent (UIP/GT Briefing Note 9)
1. Introduction This briefing note is being issued to confirm the details for submitting GT/UIP documentation for processing. 2.0 Requirements Cadent will accept all submission via the relevant address or through the post. (see section 3.0) Cadent no longer has a facility to accept documentation via a fax facility. Where the electronic route has been used there will be no requirement on the UIP/GT to support their submission with a postal hard copy. All Cadent correspondence (including acknowledgements/ acceptances and authorizations) back to the UIP/GT will remain unchanged by this facility. 3.0 Network address The following electronic submissions should be sent to the following address; Developer Land Enquiries GT / UIP Land Enquiries GT / UIP Fast Track Requests GT / UIP Quotation Requests GT / UIP Quote Acceptances Medium Pressure Tier Requests SDN Notifications RO / NRO submissions should be sent to the following address; Completion file submissions should be sent to the following address; Please note submissions sent to any other address within Cadent may incur a delay as Guaranteed Standards of performance will only commence once submission received into the correct address. 4.0 Queries Queries relating to submissions should initially be directed to the to
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.