Download presentation
Presentation is loading. Please wait.
Published byJaroslav Pavlík Modified over 5 years ago
1
Be selective and prioretize in order to be on time!
2
Automated construction of concrete block pavements
Insitu concrete 3D-print Automated construction of concrete block pavements Be selective and prioretize in order to be on time!
3
Research Concept @ TU Wien
Accelerated Pavement Tests Full scale experiments Material and interaction behavior testing PD PA block pavement PA CE PD PC PB computational engineering - optimization
4
HARD WORK FOR MORE THAN 4000 YEARS
Be selective and prioretize in order to be on time! HARD WORK FOR MORE THAN 4000 YEARS
5
Construction mistakes
Problems Expensive Construction mistakes Be selective and prioretize in order to be on time! Cutting necessary (waste of material, noisy, fine dust pollution) Limited design possibilities
6
Solution Insitu 3D Print Speed ~ 1h pro m2* Nozzle
Be selective and prioretize in order to be on time! Speed ~ 1h pro m2* Nozzle Paving block contours * Depending on resolution, finishing and geometry
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.